Skip to main content

Serbia seals the deal for start of Belgrade Corridor 11 ring-road

Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road. According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with Azvirt, the company from Azerbaijan, and China's Sinohidro. Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communica
July 21, 2016 Read time: 2 mins
Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road.

According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with 5414 Azvirt, the company from Azerbaijan, and China's Sinohidro.

Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communication Construction Company.

In November, Serbia’s Tanjug news agency reported that Serbian Prime Minister Aleksandar Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of the former Yugoslavia that dissolved after a brutal war in the late 1990s.
 
Vucic told Serbia's state broadcaster RTS that the arrangement with China was "a very favourable credit arrangement with a lengthy grace period" that was based on a “dramatically” lower construction cost.

For more information on companies in this article

Related Content

  • Tenders and financing for Serbian highways
    November 22, 2013
    The Serbian Government is considering a loan from China’s Export-Import Bank, which would pay for the construction of the E-763 highway. The bank looks set to give its approval for the €223 million loan, which would pay for 90% of the construction work for the E-763, or Obrenovac-Ljig, highway. The loan would be approved over a 20 year repayment period and a five year grace period at the fixed rate of 2.5%/year. Meanwhile tendering will open for completion works on Serbia’s Pirot-Dimitrovgrad highway unti
  • Work starts on North Korea-Russia bridge
    May 15, 2025
    Project scheduled for completion next year
  • IRF Global Road Achievement Awards (GRAA) Winning Project: Morava Corridor Motorway
    April 29, 2025

     

    Bechtel and ENKA each boast rich histories, and together, possess nearly 200 years of combined experience—an impressive feat in today’s competitive landscape. For 35 years, the joint venture has tackled some of the industry’s most challenging motorway projects. The Morava Corridor Motorway Project’s program management exemplifies a commitment to excellence, representing a complex endeavor that few can undertake.  

  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun