Skip to main content

Seattle’s Alaskan Way tolls to be kept to a minimum

Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
June 4, 2018 Read time: 2 mins
Low tolls take high priority on Seattle’s soon-to-be-open tunnel replacement for the Alaskan Way viaduct
Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year.

The Washington State Transportation Commission, owner of the tunnel, is considering several rates depending on time of day and day of week, according to local media.

The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel maintenance and raise $200 million to repay construction bonds used to build the tunnel.

“State transportation commissioners are intent on charging the lowest possible tolls for the Highway 99 tunnel, so motorists won’t be tempted to divert onto busy downtown Seattle streets,” the WSTC has said.

One option would be to set four rates ranging from $1 on weekends and $1.50 at morning peaks to $2.25 each direction during afternoon rush hour. After the first two years, tolls would increase 3% annually from 2021 to 2025.

Rates are much higher only several kilometres away from the tunnel where drivers pay express-lane tolls as high as $10 to save 20 to 25 minutes along I-405, the Seatle Times reported.

The five tolls on the Highway 520 floating toll bridge alternate through 11 time periods per weekday, ranging from $1.25 to $4.30, with minimal controversy, the Times reported.

Related Content

  • Keestrack enjoying rapid Chinese growth
    November 28, 2018
    Keestrack has increased its Chinese unit sales by more than 20% in 2018, leaving the mobile crushing and screening plant manufacturer on course to sell around 60 machines in the calendar year. Thomas Hagspiel, the company’s China and Southeast Asia managing director, said the Belgian global crushing and screening equipment firm had been delighted with Chinese customers response to Keestrack’s product offer over the past four years. The company is currently second only to Kleemann in annual China market mob
  • France-Italy tunnel in the spotlight for safety
    June 27, 2017
    An investigation is now being carried out into the safety of the new Col de Tende Road Tunnel project, currently being built.
  • Congestion charging proposal for Los Angeles
    January 21, 2019
    A new proposal for congestion charging in Los Angeles has been put forward as a possible solution to the city’s traffic woes. The CEO of the Los Angeles Metro system has suggested that a congestion charge for drivers could be used to allow riders to use the city’s transit system for free. Under the proposed scheme, drivers would be charged for entering certain districts of the city at peak travel periods. The proposal has been put forward as a way of smoothing out transport ahead of the 2028 Olympic Games.
  • Tenders and financing for Serbian highways
    November 22, 2013
    The Serbian Government is considering a loan from China’s Export-Import Bank, which would pay for the construction of the E-763 highway. The bank looks set to give its approval for the €223 million loan, which would pay for 90% of the construction work for the E-763, or Obrenovac-Ljig, highway. The loan would be approved over a 20 year repayment period and a five year grace period at the fixed rate of 2.5%/year. Meanwhile tendering will open for completion works on Serbia’s Pirot-Dimitrovgrad highway unti