Skip to main content

Russia-China set up joint venture for Amur River Bridge

A Russian-Chinese joint venture Amur-Heilongjiang has been set up for construction of a road and rail bridge across the Amur River. The project, worth around US$275 million, will connect the Russian region of Blagoveshchensk, located at the confluence of the Amur and Zeya Rivers in the far east, and the Chinese province of Heihe. according to the Kommersant newspaper. The 2.2km bridge, expected to be open by 2020, was proposed in 2007 by Valery Solomonovich Gurevich, the vice-chairman of Russia’s Jewi
March 22, 2016 Read time: 2 mins
A Russian-Chinese joint venture Amur-Heilongjiang has been set up for construction of a road and rail bridge across the Amur River.

The project, worth around US$275 million, will connect the Russian region of Blagoveshchensk, located at the confluence of the Amur and Zeya Rivers in the far east, and the Chinese province of Heihe. according to the 6440 Kommersant newspaper.

The 2.2km bridge, expected to be open by 2020, was proposed in 2007 by Valery Solomonovich Gurevich, the vice-chairman of Russia’s Jewish Autonomous Oblast. The bridge would link Nizhneleninskoye in the Oblast with Tongjiang in Heilongjiang Province.

The main reason for the bridge is to transport iron ore by rail from a Russian open pit mine in Kimkan in the Jewish Autonomous Oblast, to Chinese mills. Previous reports hav e suggested that the Petropavlovsk mining company, owner of the open pit mine, would part finance the bridge.

For more information on companies in this article

Related Content

  • Transstroy improving Russia’s aviation infrastructure
    January 21, 2014
    Aviation is playing an important role in developing Russia’s economy and resolving socio-economic issues. It’s particularly important for the country’s role as an international and domestic hub, ensuring the transportation of residents from remote regions
  • Sava River bridge completed but not open
    August 16, 2022
    The bridge between Croatia and Bosnia will open when custom facilities are finished next year.
  • Canada, US officials soon to settle planned Detroit bridge issue
    February 5, 2015
    An end to a thorny issue is close at hand concerning who will fund construction of a border customs plaza on the US side of a planned bridge linking Canada and the United States. US President Barack Obama’s US$4-trillion budget did not set aside any money for the plaza for a second consecutive year, further irritating Canadian officials who are overseeing construction of the bridge. It appears that the Canadian government might end up footing the entire bill, according to a report in Toronto’s Globe a
  • St Petersburg road contracts’ value could hit US $ 443.15mn in 2012
    August 23, 2012
    St Petersburg’s road building and repair projects could be valued at US $443.15 million (RUB 14.10bn) by the end of 2012, according to Russian daily newspaper Kommersant. The main contractors said to be bidding for projects are Mostostroy 6; Mostootrayd 19; Vozrozhdenie; Dorozhnik-92; VAD; Buer; ABZ Dorstroy; Pylon; Lendorstroy-2; and Akros.