Skip to main content

Romania to start work on the Sibiu-Pitesti A1 section in 2017

Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report. Around €1.6 billion will be spent on the route that will run through 20km of mountains. In February, the National Highway and Roads Company, CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway. But that contract has been challenged and will be scrutinised by th
April 17, 2015 Read time: 2 mins
Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report.

Around €1.6 billion will be spent on the route that will run through 20km of mountains.

In February, the National Highway and Roads Company, 2870 CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway.

But that contract has been challenged and will be scrutinised by the National Council for Solving Complaints (CNSC), according to the newspaper Nine o’Clock.

The A1 Freeway is also part of Corridor IV, one of the Pan-European transport corridors. It runs between Dresden and Nuremberg in Germany and then forks further south either to end in Thessaloniki in Greece or forks to Constanţa in Romania and then to finish in Istanbul, Turkey.

Sibiu is one of Romania’s most important cultural centres and was co-designated European Capital of Culture for the year 2007, along with the city of Luxembourg. It was formerly the centre of the Transylvanian Saxons and has been ranked as "Europe's 8th most idyllic place to live" by Forbes business magazine.

Pitești is situated further south along the A1 freeway and closer to the capital Bucharest. It is an important railway junction, has the Arpechim oil refinery and is a marketing centre for the automotive industry, in particular the Renault subsidiary Dacia.

The A1 Freeway is also part of Corridor IV, one of the Pan-European transport corridors. It runs between Dresden and Nuremberg in Germany and then forks further south either to end in Thessaloniki in Greece or forks to Constanţa in Romania and then to finish in Istanbul, Turkey.

For more information on companies in this article

Related Content

  • Romania’s Cosmeşti Bridge work underway
    April 21, 2022
    The existing Cosmeşti Bridge, which opened in 1924, is a combined road and rail structure.
  • Support for Poland’s A1
    July 6, 2012
    The European Investment Bank (EIB) has in total granted a long-term facility of €1.070 billion for the construction of the second phase of the A1 motorway forming part of the priority trans-European transport network connecting the north of Poland (Gdansk) with the Austrian capital Vienna, via the Czech and Slovak Republics. The loan will finance the construction of a 62km section of the A1 motorway between Nowe Marzy and Torun on the basis of a design, build, finance and operate (DBFO) concession. This con
  • EU funds set for renovation of the Karawanks Tunnel
    July 18, 2017
    The European Commission will provide €25 million for renovation of the 7.8k-long Karawanks Tunnel, a motorway link between Austria and Slovenia. The Karawanks is a 120km-long mountain range between Slovenia to the south and Austria to the north. Around €6.5 million will go towards planning and €18 million will be set aside for reconstruction.
  • Serbia: Putevi Srbije to build 2.4km of Corridor 11 access road
    April 14, 2015
    Serbian road contractor Putevi Srbije will build around 2.4km of access roads around the town of Ljig in central Serbia, according the state Ministry of Construction, Transport and Infrastructure. The access roads will be for the Corridor 11 motorway, which is under construction from the Serbian capital Belgrade running southwest into Montenegro, ending at the Adriatic coastal tourist town of Bar. The Belgrade-Bar motorway will be around 280km long and be the main link for a ferry service from the Ita