Skip to main content

Romania receives upwards of 20 tenders for Craiova-Pitesti highway

Romania’s National Company for the Administration of Road Infrastructure has received 20 tenders for two segments of the Craiova-Pitesti highway.
November 2, 2017 Read time: 1 min
Romania’s National Company for the Administration of Road Infrastructure has received 20 tenders for two segments of the Craiova-Pitesti highway.


Both will be around 57km long and are estimated to be worth around €435 million.

Companies that have tendered include Astaldi, Vahostav, Alsim Alarko Sanayi Tesisleri ve Ticaret, the joint venture (JV) Constructii Erbasu - Vahostav SK - Trameco, Secol Societa Edile Costruzioni e Lavori SA - Secol Romania - Tirrena Scavi JV and Spedition UMB - Tehnostrade - Consitrans JV.

The Craiova-Pitesti highway will have lanes be part of the Pan European Corridor IV.

Related Content

  • Delayed ring road due for completion
    May 15, 2012
    In Romania, modernisation of capital Bucharest’s ring road is now due for completion in 2012. The delay has been caused by a lack of funds. Upgrading of the sections between DN7 and DN1A and DN1A (Mogosoaia)and DN1 (Otopeni) started in 2007 and some 51km have been improved so far. The total length of the ring road will be 71km when it is complete. Tenders still have to be launched for two more sections of the ring road, the 11km DN2/A2 stretch and the 8.6km A1/DN7 section. Financing for these last section
  • Fugro to use its ARAN system in Dutch surveying deal
    May 9, 2019
    Fugro, a geo-data specialist, is using the latest version of its Automatic Road Analyser (ARAN) in a new five-year pavement survey contract for Dutch highways. The contract, with an option to extend to 10 years, was awarded by the Dutch infrastructure agency Rijkswaterstaat. It includes the collection of surface condition and road measurement data from 8,600km of principal highways each year. The company’s Automatic Road Analyser - ARAN - which is adapted to meet European specifications and includes i
  • Poland: S6 expressway and A2 motorway receive EU funding
    November 23, 2018
    Subsidies worth more than €228 have been granted by the European Union for the construction of the S6 expressway section to link Slupsk with Gdansk. Also, around €77 million from the EU has been granted for the A2 section between Warsaw and Minsk Mazowiecki. The S6 section will be almost 41km long and will cost over €470 million is expected to be completed in October 2021. The 15km A2 section is due to be ready in June 2020 at a total cost of €193 million.
  • Kapsch Group expands in Romania
    April 26, 2012
    Kapsch Group has signalled major expansion in Romania with the opening of a new, larger branch office, plans to increase the number of employees, and estimated incomes of more than US$20million by 2015.