Skip to main content

Romania to build wildlife bridges over the A1

Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country. The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. nTenders will be issued for both the design and construction with work to start by the end of the summer. When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction.
June 17, 2019 Read time: 2 mins
Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country.


The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. Tenders will be issued for both the design and construction with work to start by the end of the summer.

When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction. The motorway starts in the western part of the capital Bucharest and connects the cities of  Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

Meanwhile, the Constructii-Hidroelektra Mehanizacija joint venture has won the tender for construction of a Transylvania motorway segment between Suplacu de Barca and Chiribis. The 26km stretch could cost nearly €77.5 million. It will have 19 bridges, viaducts and passageways.

Another Transylvania motorway contract was won by the Trameco-Vehostav consortium for construction of a 28.5km stretch between Chiribis and Biharia. The deal is worth around €69 million and includes 18 bridges, passageways and viaducts.

Related Content

  • Romania's new tunnel deal
    February 24, 2012
    A consortium will build a new tunnel in Romania as part of the Orastie-Sibiu highway project.
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Romanian road works moving ahead
    December 9, 2022
    Romanian road works are now moving ahead.