Skip to main content

Romania to build wildlife bridges over the A1

Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country. The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. nTenders will be issued for both the design and construction with work to start by the end of the summer. When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction.
June 17, 2019 Read time: 2 mins
Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country.


The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. Tenders will be issued for both the design and construction with work to start by the end of the summer.

When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction. The motorway starts in the western part of the capital Bucharest and connects the cities of  Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

Meanwhile, the Constructii-Hidroelektra Mehanizacija joint venture has won the tender for construction of a Transylvania motorway segment between Suplacu de Barca and Chiribis. The 26km stretch could cost nearly €77.5 million. It will have 19 bridges, viaducts and passageways.

Another Transylvania motorway contract was won by the Trameco-Vehostav consortium for construction of a 28.5km stretch between Chiribis and Biharia. The deal is worth around €69 million and includes 18 bridges, passageways and viaducts.

Related Content

  • Romania’s new road works commencing
    August 22, 2022
    Work is due to commence on new road sections in Romania.
  • Poland calls a tender for work on the Biskupia Gorka viaduct
    May 25, 2017
    Poland will have to spend around €7.12 billion to complete its section of the trans-European Via Carpathia. Work on the north-south transport corridor could be completed by 2025, the government said during a recent European Economic Congress held in the Polish city of Katowice. The route is planned to run nearly 1,600km from the Lithuanian Baltic Sea port city of Klaipeda to the Greek city of Thessaloniki on the Aegean Sea. It passes through Poland, Slovakia, Hungary, Romania and Bulgaria. It will cross cor
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • UGL wins Australia’s NorthConnex M&E services contract
    September 7, 2015
    Engineering services provider UGL has signed a four-year deal with the Lend Lease Bouygues joint venture that is building the NorthConnex motorway in Sydney, Australia. The US$329 million contract is for the design, procurement, construction and commissioning of the electrical, mechanical, communication, fire and control systems needed for the project’s 9km twinned tolled tunnel. UGL provides outsourced engineering, asset management and maintenance services to rail, transport, power, resources, water an