Skip to main content

Ramboll to upgrade two junctions on the A55 North Wales Expressway

Engineering consultancy Ramboll has won a €40 million design contract to upgrade two junctions on the A55 North Wales Expressway in the UK. The A55 North Wales Coast Road between Conwy and Bangor comprises one of the most dramatic highways in the country. The road squeezes between rugged mountains and the Irish Sea and comprises several tunnels. Between 1970 and 2000 the road was renovated into a dual carriageway, linking Chester and Holyhead. It is now part of the E22 Trans European Network Route
December 13, 2017 Read time: 2 mins

Engineering consultancy 6801 Ramboll has won a €40 million design contract to upgrade two junctions on the A55 North Wales Expressway in the UK. 

The A55 North Wales Coast Road between Conwy and Bangor comprises one of the most dramatic highways in the country. The road squeezes between rugged mountains and the Irish Sea and comprises several tunnels.

Between 1970 and 2000 the road was renovated into a dual carriageway, linking Chester and Holyhead. It is now part of the E22 Trans European Network Route between Dublin and Moscow.

The length of Euro-route within the UK - Hull to Holyhead - comprises grade-separated interchanges allowing the free flow of traffic, apart from the at-grade roundabouts at junctions 15 and 16.

Ramboll will have to consider the encroachment of development and buildings on the inland side of the road and the proximity of the railway on the coastal side. Ramboll said that the space available for free flow links and slip roads is highly constrained.

For more information on companies in this article

Related Content

  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • INTERMAT organisers see strong growth in construction
    December 12, 2017
    The organisers of the upcoming INTERMAT trade show for construction and infrastructure see strong growth for the sector. The INTERMAT organisers have unveiled the first Construction Industry Observatory report, which was produced in association with French government agency, Business France. The report provides construction-equipment manufacturers with strategic data on 12 countries in the EMEA zone. These nations have been selected for their planned investment levels in infrastructure, which total €1,600