Skip to main content

Preparations for Polish project – widening work

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish
December 13, 2018 Read time: 1 min

Widening work for Poland’s A2 highway will be carried out between the Lodz Polnoc Junction and Konotopa Junction. The 88km highway stretch will benefit from the addition of an extra lane in either direction. Between Polnoc and Pruszkow this will result in a third lane being added in either direction. Between Pruszkow and Konotopa meanwhile this will result in a fourth lane being added in either direction. The construction work will take until 2021 to complete and will cost around €139.22 million. The Polish ministry of infrastructure has signed off on the budget for the work to be carried out

Related Content

  • Polish dual carriageway contracts being agreed
    February 18, 2020
    Two important dual carriageway contracts are being agreed in Poland.
  • Texas highway projects moving ahead
    June 4, 2018
    Two major highway projects are now moving ahead in Texas. One project is for the Grand Parkway around Houston, the other is for the construction of three bridges at an interchange on US 290. Grand Parkway Infrastructure is to construct a stretch of the Highway 99 Grand Parkway, which will run around Houston. In all the project for the 295km gyratory highway is costing US$1.28 billion. The package of works was awarded by the Texas Department of Transportation and involves building extra toll lanes as well a
  • EU funds for Polish eastern voivodeships
    February 13, 2024
    The total available under the European Funds for Eastern Poland programme is €2.7 billion of which around €430 million is for roads.
  • Polish concrete plant production
    May 17, 2022
    A Lintec CCP3000D containerised concrete plant is helping with construction and work for Polish roads.