Skip to main content

Polish Via Carpathia section attracts 11 bids

Turkish contractor Kolin Insaat has submitted the lowest bid.
By David Arminas July 17, 2020 Read time: 1 min
Poland’s GDDKiA is delighted with Turkish bid around Bialystok (photo © Didreklama/Dreamstime)

Turkish contractor Kolin Insaat has submitted the lowest bid for the section of Poland’s S19 Via Carpathia between the villages of Zachod and Ksiezno.

Kolin Insaat’s offer – one of 11 bids - is €130.1 million (US$150.06 million) for the design and build contract in the metropolitan area of Bialystok, a city in eastern Poland.

The highest bid of €161.1 million (US$182.5 million) came in from Polish contractor Mostostal, according to Poland’s General Directorate for National Roads and Motorways, GDDKiA.

The winner is expected to be announced this autumn with work starting soon after. Completion is set for 2024.

The S19, as well as the S61, constitute part of the trans-European route Via Carpathia, of which many sections are either under construction or in the planning stages. It will eventually connect Klaipėda in Lithuania with Thessaloniki in Greece.

Poland’s Expressway S19 will run from the border crossing to Belarus in Kuźnica through Białystok, Lublin and Rzeszów to the border with Slovakia at Barwinek, where it will connect with Slovakia’s future R4 Expressway.

For more information on companies in this article

Related Content

  • Slovakia looking for more road financing
    June 13, 2017
    The Slovak government is exploring options for road financing after 2020, according to the media.
  • Land acquisition delays the start of Bratislava's orbital road
    September 25, 2017
    Land acquisition issues have stalled the start of construction of Bratislava’s orbital road by up to eight months. Work could begin this autumn, according to a report by the Slovak Spectator, because the government is working on laws that would allow construction before all land is acquired.
  • TensarTech supports Polish contract
    November 12, 2012
    TensarTech soil retaining walls have been used during the construction of a section of the A1 motorway in Poland. Extensive underground mining in the south of the country posed a significant challenge to building the 16km Piekary Slaskie to Pyrzowice (Katowice Airport) stretch of the motorway which, on completion, will run more than 240km from Gdansk in northern Poland to Gorzyczki on the Polish-Czech Republic border. To accommodate potential differences in settlement on embankments approaching a series of
  • Vietnam: North-South Expressway bidding
    November 17, 2022
    The package for the Can Tho-Hau Giang section has the biggest value, at US$320 million.