Skip to main content

Polish Via Carpathia section attracts 11 bids

Turkish contractor Kolin Insaat has submitted the lowest bid.
By David Arminas July 17, 2020 Read time: 1 min
Poland’s GDDKiA is delighted with Turkish bid around Bialystok (photo © Didreklama/Dreamstime)

Turkish contractor Kolin Insaat has submitted the lowest bid for the section of Poland’s S19 Via Carpathia between the villages of Zachod and Ksiezno.

Kolin Insaat’s offer – one of 11 bids - is €130.1 million (US$150.06 million) for the design and build contract in the metropolitan area of Bialystok, a city in eastern Poland.

The highest bid of €161.1 million (US$182.5 million) came in from Polish contractor Mostostal, according to Poland’s General Directorate for National Roads and Motorways, GDDKiA.

The winner is expected to be announced this autumn with work starting soon after. Completion is set for 2024.

The S19, as well as the S61, constitute part of the trans-European route Via Carpathia, of which many sections are either under construction or in the planning stages. It will eventually connect Klaipėda in Lithuania with Thessaloniki in Greece.

Poland’s Expressway S19 will run from the border crossing to Belarus in Kuźnica through Białystok, Lublin and Rzeszów to the border with Slovakia at Barwinek, where it will connect with Slovakia’s future R4 Expressway.

For more information on companies in this article

Related Content

  • Skanska to Slovakia’s D1 motorway for €214 million
    September 6, 2016
    Skanska has won a contract with the National Highway Authority (NDS) to extend the 14.4km long motorway D1 in eastern Slovakia. The new motorway will include 23 bridges and four viaducts, along with required noise protection. Another R2/R4 express road will also be extended.
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
  • Slovakia concerned over tenders for D1 Presov and D3 Cadca bypasses
    September 14, 2016
    The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs. The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda. Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia. The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said. The Slovak Insti
  • Polish flood damage
    May 30, 2012
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) says that the country has suffered some €195 million worth of road damage due to recent flooding. The problem is expected to grow once the cost of damage to further roads in the north of the country can be ascertained. The damage includes links under construction at present.