Skip to main content

Polish Via Carpathia section attracts 11 bids

Turkish contractor Kolin Insaat has submitted the lowest bid.
By David Arminas July 17, 2020 Read time: 1 min
Poland’s GDDKiA is delighted with Turkish bid around Bialystok (photo © Didreklama/Dreamstime)

Turkish contractor Kolin Insaat has submitted the lowest bid for the section of Poland’s S19 Via Carpathia between the villages of Zachod and Ksiezno.

Kolin Insaat’s offer – one of 11 bids - is €130.1 million (US$150.06 million) for the design and build contract in the metropolitan area of Bialystok, a city in eastern Poland.

The highest bid of €161.1 million (US$182.5 million) came in from Polish contractor Mostostal, according to Poland’s General Directorate for National Roads and Motorways, GDDKiA.

The winner is expected to be announced this autumn with work starting soon after. Completion is set for 2024.

The S19, as well as the S61, constitute part of the trans-European route Via Carpathia, of which many sections are either under construction or in the planning stages. It will eventually connect Klaipėda in Lithuania with Thessaloniki in Greece.

Poland’s Expressway S19 will run from the border crossing to Belarus in Kuźnica through Białystok, Lublin and Rzeszów to the border with Slovakia at Barwinek, where it will connect with Slovakia’s future R4 Expressway.

For more information on companies in this article

Related Content

  • Slovakia’s R2 Expressway moves a step closer
    June 4, 2018
    Slovakia said it will tender this year for the 14km R2 expressway linking Roznava and Jablonov nad Turnov with completion likely in 2024. Slovakia's transport minister Arpad Ersek said construction could start by Q3 2019. R2 is a 360km route that will run from Kosice in the east across the country to Trenčín, near the Czech border in the west. It will pass through Bánovce nad Bebravou, Prievidza and Lučenec. Roznava is an economic and tourist centre around 70km from Kosice.
  • JP Autoceste eyes 2020 as completion date for Bosnia’s Corridor 5c
    March 3, 2016
    Around two-thirds of the Corridor 5c motorway project is expected to be completed by 2020, according to the director of the Bosnian motorways company JP Autoceste. Jasmin Buco said that 120km out of 337km of the motorway are complete. The corridor section, to connect Budapest with Ploce port in Croatia, is taking the most time. He said that the cost of the remaining part of the motorway is expected to be around €2.81 billion.
  • FIEC aims to tackle lowest possible cost bidding
    February 28, 2012
    The FIEC, the European construction industry federation, aims to end unfair competition by state-owned and state-aided enterprises across the globe.
  • Polish tunnel project receiving bids
    September 15, 2017
    Bids are now being received for an important tunnel project in northern Poland. The country’s General Directorate for National Roads and Motorways (GDDKiA) has had four offers worth between €194 million and €259 million for the construction of the tunnel. The new link is planned to be built in Swinoujscie and will run under the Swina River to Uznam Island with Wolin Island.