Skip to main content

Polish capital route project being planned

Route reviews are being carried out for a key Polish project. Poland’s highways authority, GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.
September 9, 2019 Read time: 1 min

Route reviews are being carried out for a key Polish project. Poland’s highways authority, 1361 GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.

For more information on companies in this article

Related Content

  • Work starting on Norway’s mega-tunnel project
    January 5, 2018
    Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
  • Contractor STRABAG is building Poland’s S8 route
    February 9, 2016
    Austrian contractor STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several stru
  • Polish expressway project gets go ahead
    December 19, 2017
    With the official go ahead being given for a new expressway in Poland’s southern Silesia Region, tendering can now commence. This last stretch of the S1 expressway will run from Bielsko-Biala to Zwardon and will measure 8.5km long. Tendering is now starting for the project, which is expected to cost in the region of €351.25 million and should take two years to build. This new road project forms part of the 2014-2023 National Road Construction Programme.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the