Skip to main content

Poland’s next A2 motorway section to cost €348million

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
January 21, 2019 Read time: 2 mins

Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia.

A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023.

Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan.

The A2 runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt, where it connects to the German A12 autobahn, through Poznań and Łódź to Warsaw. It is part of the European route E30 connecting Berlin and Moscow. On 4 June 2014, the motorway was officially named Autostrada Wolności (Motorway of Freedom).

The plan is for the A2 to be gradually extended eastwards from the capital Warsaw to the Terespol area where it will connect to the M1 highway. A2 does not officially run through Warsaw. Instead the eastern and western segments will be connected by other roads including the S2 Expressway.

Related Content

  • Slovakia opens Levoca bypass of D1 motorway section
    December 4, 2015
    Slovakia has opened the 9.5km Levoca bypass, nearly completing the northern part of the D1 cross-country motorway. The remaining section between Bratislava and Kosice is expected to be open around 2020, with the Zilina, Presov and Ruzomberok bypasses yet to be built. The newly opened section of Janovce - Jablonov II includes the 600m tunnel Sibenik, as well as a slip road to Levoca and 12 road bridges. Construction works on the D1 section started in June 2012 by the consortium of Eurovia and Stavby M
  • Poland announces €534 million Bridges for Regions programme
    May 30, 2018
    A bridge on the San River near Jarosław will be the first of 22 to be constructed under the Polish government’s Bridges for Regions programme. Central government will fund around 80% or the programme that is expected to cost about €534 million, said Mateusz Morawiecki, the prime minister. The rest will be contributed by local governments, with some of the money coming from a local roads fund to be set up in the autumn. The fund will also provide financing for the modernisation of existing bridge crossings,
  • Polish tenders worth €4.6 billion to be announced in 2019
    January 11, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) will announce tenders worth around €4.64 billion for construction of around 435km of roads this year. Included will be 172km of the S19 expressway in Podlaskie and Podkarpackie, a 60km stretch of the S7 expressway in Mazowsze and Malopolskie and a 50km section of the S11 expressway in Zachodniopomorskie. Late last year, a Polish parliamentary commission said that it had heard that €11.14 billion of road investment within the 2014-2
  • Poland's highway plans to go ahead
    May 15, 2012
    In Poland, the European Investment Bank has committed itself to maintaining its loan agreement for the A1 highway, despite recent problems over the project. The e1.1 billion loan that the EIB had agreed with Autostrada Poludnie for construction of a 180km section of the A1 highway from Strykow to Pyrzowice, will now be placed at the disposal of the Polish highway authorities. To carry out the work, Poland has to raise a further e503 million, which could be obtained from an issue of road bonds. Autostrada Po