Skip to main content

Poland: tendering for Lodz's Western Ring-Road attracts 17 offers

The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
February 10, 2017 Read time: 2 mins
The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media.

Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction.

3302 Budimex has reportedly made the lowest offer in both contract contests.

Polish media also reported that €530 million from the European Union’s Cohesion Fund will be invested in northern Poland’s roads. The first project will be a €463mn investment in the Gdansk-Elblag section of the DK7 national road on the Baltic-Adriatic section of the Trans-European Transport Network (TEN-T) that connects northern and southern Europe.

The second project, worth around €68 million involves renovating the section between Wyszków and Bialystok on the E67 part of the EN-T North Baltic Sea corridor, which connects the west to the north east of Europe.

In eastern Poland, the Program Polska Wschodnia will fund six road projects in worth more than €119 million. The projects will include both new roads and extensions of existing ones. Among the projects likely to be funded are the DW762 Kielce Poludnie-Checiny in Swietokrzyskie voivodeship, DK19 in Rzeszow, DW687 Kleosin-Markowszczyzna in Podlaskie and DW676 Bialystok-Suprasl.

For more information on companies in this article

Related Content

  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • Doboj headed for a 5C bypass
    November 2, 2020
    The 53km bypass is part of upgrading for the European route Corridor 5C.
  • Ramboll to upgrade two junctions on the A55 North Wales Expressway
    December 13, 2017
    Engineering consultancy Ramboll has won a €40 million design contract to upgrade two junctions on the A55 North Wales Expressway in the UK. The A55 North Wales Coast Road between Conwy and Bangor comprises one of the most dramatic highways in the country. The road squeezes between rugged mountains and the Irish Sea and comprises several tunnels. Between 1970 and 2000 the road was renovated into a dual carriageway, linking Chester and Holyhead. It is now part of the E22 Trans European Network Route
  • New US$200 million ring road to be built in Belarus capital Minsk
    May 23, 2014
    Minsk is to benefit from a new ring road that will cut city congestion - Eugene Gerden reports The government of Belarus is investing more than US$200 million in the building of a new ring road around the country’s capital Minsk, in accordance with a government decree. Implementation of the project is taking place as part of the existing large-scale state road building programme in the country until 2017, with the total cost estimated at US$5 billion. The new road will measure some 85km long and will feat