Skip to main content

Poland: tendering for Lodz's Western Ring-Road attracts 17 offers

The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
February 10, 2017 Read time: 2 mins
The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media.

Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction.

3302 Budimex has reportedly made the lowest offer in both contract contests.

Polish media also reported that €530 million from the European Union’s Cohesion Fund will be invested in northern Poland’s roads. The first project will be a €463mn investment in the Gdansk-Elblag section of the DK7 national road on the Baltic-Adriatic section of the Trans-European Transport Network (TEN-T) that connects northern and southern Europe.

The second project, worth around €68 million involves renovating the section between Wyszków and Bialystok on the E67 part of the EN-T North Baltic Sea corridor, which connects the west to the north east of Europe.

In eastern Poland, the Program Polska Wschodnia will fund six road projects in worth more than €119 million. The projects will include both new roads and extensions of existing ones. Among the projects likely to be funded are the DW762 Kielce Poludnie-Checiny in Swietokrzyskie voivodeship, DK19 in Rzeszow, DW687 Kleosin-Markowszczyzna in Podlaskie and DW676 Bialystok-Suprasl.

For more information on companies in this article

Related Content

  • Green light for S6 dual carriageway section in Zachodniopomorskie
    December 14, 2016
    Poland’s Zachodniopomorskie province has given the go-ahead to the consortium set up by Dragados and Polaqua to start construction of a section of the S6. A deal was done in October 2015 for work on the 24km section of the dual carriageway between Kielpino and Kolobrzeg. The cost is estimated to be nearly €105 million. Meanwhile, a section of the S19 express road - between Slawinek junction and the northern part of the Lublin city ring road – was opened this month. Budimex built the 10km stretch in so
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
  • Czech tenders for section of D11, part of the E67 Via Baltica
    July 15, 2016
    The Czech road management company RSD is seeking a contractor for construction of 15km of the D11 motorway between Hradec Kralove and Smirice. Both towns are in northern Czech Republic, near the Polish border. The work is worth around €218.3 million, according to Czech media, and is one of the last remaining sections of the D11 to be built. Construction of another section between the town of Trutnov and the border with Poland is likely to start in 2019 and the Jaromer-Trutnov section after 2020.
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the