Skip to main content

Poland place Via Carpatia on list of priorities

The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023. The government also increased the budget for building roads by €6.7 billion to €32.1 billion. The announcements are part of the National Road Construction Programme (PBDK).
July 18, 2017 Read time: 2 mins

The Polish government has put the planned 570km Via Carpatia – Expressway S19 – on a priority list and wants it finished by 2023.

The government also increased the budget for building roads by €6.7 billion to €32.1 billion.

The announcements are part of the National Road Construction Programme (PBDK).

The S19 road will run from the border with Belarus in Kuznica through Sokolka, Bielsk-Podlaski to Chlebczyn.

According to Polish media, a 60km shorter route is under consideration, with the road passing through Czarna Bialostocka and Sokolka instead of Knyszyn and Korycin.

A first phase of building the road will include a small northern ring road of Bialystok Sochonie-Dobrzyniewo-Choroszcz to connect with the S8. The estimated cost for building the 248km road will reach €2.85 billion.

Meanwhile, the 1054 European Investment Bank has granted Poland a €325 million loan for three dual carriageway sections totalling 110km of the S7 and S8 dual. The roads will run through the Mazowieckie voivodeship. Poland’s state-owned development bank Bank Gospodarstwa Krajowego will distribute the loan.

Also, the European Regional Development Fund recently awarded the city of Katowice €107 towards a €127 million road investment programme.

Work includes rebuilding two major road junctions in the district of Giszowiec, where national roads 86 and 81 intersect.

For more information on companies in this article

Related Content

  • Upgrading Poland's roads for UEFA 2012
    February 7, 2012
    POLAND has ambitious plans to construct around 900km of new highways in time for the European Football Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Strabag wins Polish road contracts worth €170 million
    November 2, 2017
    European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.