Skip to main content

Poland bidders angry over Astaldi win for Warsaw Ring Road work

Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
June 18, 2015 Read time: 2 mins
Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority 1361 GDDKiA chose 1324 Astaldi as the winner.

Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, 3976 Porr Polska, Salini Polska and IDS-BUD.

The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports.

World Highways reported in February that Astaldi’s €290 million bid was the lowest offer for the project. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete.

The dispute comes just as an engineering and construction group led by Astaldi signed the largest construction financing package in Turkey’s history – US$5 billion - to refinance existing loans and provide new funding for a $6.4 billion toll road.

Astaldi and its Turkish partners 3338 Nurol Insaat, 3340 Makyol Insaat and Ozaltin Insaat agreed to the loan from nine lenders, including 3321 Deutsche Bank for the 400km road and suspension bridge across the Sea of Marmara. Financial news agency Bloomberg said the loan is the largest for a project in Turkey.

Astaldi said in a written statement that the new financial package will allow completion of the final portion of the 301km route linking the city of Bursa to the Aegean port of İzmir (Phase 2B) and to refinance the sections under construction for the Gebze-Orhangazi-Bursa link (Phase 1 and Phase 2A).

For more information on companies in this article

Related Content

  • Poland pushes ahead with major new roads programme
    September 11, 2015
    The Polish government will spend around US$28.3 billion over the next eight years in one on the country’s largest new-road investment programmes. Nearly 4,000km of motorways and dual carriageways will be constructed as well as 50 ring roads around urban centres. More than 1,000 sections of roads deemed dangerous will be rebuilt, according to a report in the Polish newspaper Gazeta Prawna. The announcement comes after the Poland’s road and motorways authority GDDKiA said in June that it plans to awa
  • Poland tenders for more A2 work between Lodz and Warsaw
    January 8, 2019
    A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport
  • GRAA winner profile: world’s longest suspension bridge has opened in Turkey
    May 3, 2022
    The opening of the majestic 1915 Canakkale Bridge on March 18, 2022, well ahead of its initial schedule, has set new records for Turkey and international bridge engineering. After Istanbul's three bridges over the Bosphorus Strait, Turkey now boasts a fourth bridge connecting Europe and Asia, and the first to span the Dardanelles Strait.
  • Mostostal Warszawa makes lowest bids in Poland’s S9 tenders
    November 24, 2017
    A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.