Skip to main content

Plans delayed for Bosnia’s Lasva-Travnik high-speed road

Construction of the 25km Lasva-Travnik express road in Bosnia and Herzegovina has been delayed, according to the government. Adnan Terzic, director of the motorways company Autoceste FBiH, said the issue is funding and the company is awaiting release of around €92 million by the International Monetary Fund (IMF).
August 17, 2017 Read time: 1 min
Construction of the 25km Lasva-Travnik express road in Bosnia and Herzegovina has been delayed, according to the government.


Adnan Terzic, director of the motorways company 5740 Autoceste FBiH, said the issue is funding and the company is awaiting release of around €92 million by the 3684 International Monetary Fund (IMF).

The government is reportedly seeking to replace the IMF's funding with money from commercial banks through an issue of treasury bills.

The four-lane road, which will include 18 bridges and viaducts and three tunnels, links Travnik with the capital Sarajevo and other wealthy regions. It will be vital to the economic development of central Bosnis, a report in the Sarajevo Times said.

When the Lasva-Travnik road is completed, work will start on the Travnik to Jajce road, worth around €280 million.

For more information on companies in this article

Related Content

  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • IFC to provide consultancy on three-section Corridor Vc works
    May 3, 2013
    JP Autoceste FBiH, the state-owned motorway company of Bosnia's Muslim–Croat Federation, has revealed that the International Finance Corporation (IFC) will provide consultancy for finding a private partner for three sections of Corridor Vc. The IFC consultancy-covered sections are Doboj Jug (Karusa)-Medakovo (4km); Medakovo-Ozimica (21km); and Ozimica-Poprikusa (13.7km). The consultancy deal will last for a period of 15 months during which a due diligence of costs and a study for the three Corridor Vc secti
  • EIB backing Irish motorway link
    April 30, 2014
    The European Investment Bank (EIB) is providing financial backing worth €144 million for the new M17/M18 Gort-Tuam motorway project. The M17/M18 Gort to Tuam PPP Scheme is situated in the west of Ireland and will be constructed as a four lane motorway that will replace the existing N17/N18 roads. This new motorway will reduce journey times by around 20 minutes and has an overall cost estimated at €550 million. Construction work will start during this year and this is the second transport PPP to be signed un