Skip to main content

Pilosio improves SlabProp range with the SlabProp 2.0

As part of upgrades to the SlabProp range from Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031). Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity. This prop is made of aluminium type 6005A for a good ca
July 8, 2016 Read time: 2 mins
As part of upgrades to the SlabProp range from 7163 Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised

The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031).

Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity.

This prop is made of aluminium type 6005A for a good capacity-to-weight ratio. Pilosio says that this reduces number of post shores required resulting in labour cost savings. It can also be used as single post shore, in combination with other props one on top of the other to reach greater heights or connected with truss frames to create shoring towers.

The SlabProp 2.0 is totally compatible with Slabform and Liteform panel system.

The range of products also includes a series of extension props to increase the flexibility of the system: lengths are 0.5m up to 1.5m. Connecting frames are available in different lengths, from 75-305cm. They can be attached to the inner tube or to the outer tube. Both sections allow quick connection with the hook.

Bearing towers can be easily assembled flat on the ground.

For more information on companies in this article

Related Content

  • Bridge work is no problem for Terex concrete paver Bid-Well 3600
    May 30, 2018
    Terex says that its Bid-Well 3600 automatic paver roller is flexible enough to deliver high-quality paving for both slab-on-grade and bridge applications. Meeting a variety of inline paving and skewed bridge designs, the 3600 paver offers standard paving width configurations from 2.4-26.2m with on-the-fly paving widths changes of up to 9.1m. It quickly adapts to the contractor’s bridge deck placement and slab-on-grade paving needs. Kraemer North America recently used an MLC300 to help replace an 84-ye
  • New CEO plans global expansion for Pilosio
    April 15, 2016
    The new CEO of Pilosio, Johann Strunz, has some ambitious expansion plans for the euro45m-turnover company. The former managing director of Doka’s Austrian business plans to decentralise the Italian formwork and falsework specialist, with hubs in various regions in addition to its Italian headquarters. “We are moving from being a head-quartered company to a decentralised structure,” said Strunz. “We want to give power to the markets. They will decide on the pace and the headquarters will define the quali
  • Toggenburger takes two Terex cranes to tackle a Swiss tandem lift
    August 21, 2015
    Two of the largest cranes in Switzerland recently were called upon to lift an 884tonne, 162m-long connecting bridge between two buildings at the Coop distribution centre in Schafisheim. “The individual bridge components had enormous gross weights of up to 275tonnes and required us to use working radii of up to 29m,” said Andre Huber, project manager at Toggenburger, the company that took on the task. To get the job done, Toggenburger rolled out its biggest machinery which also happen to be the two lar
  • Premiere in the Black Forest
    October 5, 2023
    One of the steepest sections of the B 500, an important road in the southern Black Forest, had to be renewed in the summer of 2023 – more precisely: the first kilometres behind the Triberg town sign, past the famous waterfalls. Asphalt paving specialists from Gebrüder Bantle GmbH & Co. KG were commissioned to resurface the carriageway.