Skip to main content

Pilosio improves SlabProp range with the SlabProp 2.0

As part of upgrades to the SlabProp range from Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031). Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity. This prop is made of aluminium type 6005A for a good ca
July 8, 2016 Read time: 2 mins
As part of upgrades to the SlabProp range from 7163 Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised

The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031).

Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity.

This prop is made of aluminium type 6005A for a good capacity-to-weight ratio. Pilosio says that this reduces number of post shores required resulting in labour cost savings. It can also be used as single post shore, in combination with other props one on top of the other to reach greater heights or connected with truss frames to create shoring towers.

The SlabProp 2.0 is totally compatible with Slabform and Liteform panel system.

The range of products also includes a series of extension props to increase the flexibility of the system: lengths are 0.5m up to 1.5m. Connecting frames are available in different lengths, from 75-305cm. They can be attached to the inner tube or to the outer tube. Both sections allow quick connection with the hook.

Bearing towers can be easily assembled flat on the ground.

For more information on companies in this article

Related Content

  • Milling machine developments to boost efficiency
    October 20, 2016
    A series of developments in the milling machine market will give customers both greater choice and performance – Mike Woof writes. Competition is heating up in the market for milling machines, which has been dominated for many years by Wirtgen. The German firm still retains a strong share of this market, but is now facing much tougher levels of competition from key rivals, and Atlas Copco, BOMAG, Caterpillar and Roadtec in particular. Meanwhile the market is also seeing the return of another familiar nam
  • Asphalt plant innovations coming to market
    April 27, 2015
    A series of new advances in asphalt plant design are now coming to market - Mike Woof writes Key innovations in asphalt plant designs from major manufacturers will offer clients reductions in running costs along with gains in quality control and output. Several of the leading manufacturers are introducing new models that will deliver efficiency gains, as well as options for greater mobility and/or versatility. Swiss-based Ammann is introducing two new mobile plants, the EcoBatch and QuickBatch models,
  • Kögel is offering tough and lightweight tipping trailers
    March 14, 2013
    Heavy equipment trailer specialist Kögel has developed two novel tipper trailers, featuring two and three axles.The two axle tipper trailer offers a load volume of 24m³ or 27m³ with a 4mm-thick Hardox 450 base and side walls made from aluminium. The advantage of the steel base with lightweight walls means that it can be used continuously for more than 10 years, while an aluminium trough would need repairs every two to three years.
  • Kögel is offering tough and lightweight tipping trailers
    January 6, 2017
    Heavy equipment trailer specialist Kögel has developed two novel tipper trailers, featuring two and three axles.The two axle tipper trailer offers a load volume of 24m³ or 27m³ with a 4mm-thick Hardox 450 base and side walls made from aluminium. The advantage of the steel base with lightweight walls means that it can be used continuously for more than 10 years, while an aluminium trough would need repairs every two to three years.