Skip to main content

Odebrecht wins Brazilian highway concession

Odebrecht has been awarded a concession for Brazil’s important BR-163 federal highway route. The 851km section of highway runs through Mato Grosso state and the deal is worth some US$2 billion, according to a report by Business News Americas. As part of its contract, Odebrecht will have to widen a 454km stretch of the route within five years and is also required to build nine new toll booths.
November 29, 2013 Read time: 2 mins
RSSEthiopia is set to benefit economically from investment in a number of new key road links totalling over US$1 billion.

The east African nation’s 218km Modjo-Hassan highway is expected to cost US$720 million to construct. The highway will be constructed in two stages. The first section of the route will stretch 93km from Modjo to Zeway and is expected to cost $350 million to complete. The second section of the highway will be 125km long and link Zeway with Hewassa and this stretch is estimated to cost $370 million to build. However, funding for the highway project has yet to be finalised. The Ethiopia Roads Authority (ERA) is looking to obtain a portion of the project’s funding from the China Exim Bank and the 2332 World Bank, as well as a $350 million tranche from the South Korean Government and the 1586 African Development Bank.

Two Chinese firms are building another new road connection. The 133km road will run from Mille to Kombolcha, through Bati. Shandong Highway is working on a 73km stretch of the route from Milla to Burka, while Zhongmei Engineering has the Deal for the 60km stretch of road from Burka to Kombolcha. The project is being carried out for the Ethiopian Government and is being handled by the Ethiopian Roads Authority (ERA). Indian firm International Consultants & Technocrats (ICT) has a US$1.38 million consultancy contract to oversee the project through a joint venture with local firm Civil Works Consulting Engineers.

A third key road link will benefit transport links in and around Ethiopia’s capital, Addis Ababa. The city authorities are planning work on the road connecting the Inter-city bus terminal with the Lideta Church, and the road between St George Church and 18 Mazoria. The work was due to begin this month and will take a year to complete. The authorities say they will require a budget of some US$397 million to build up to 113km of roads with asphalt surfaces in the 2013/2014 period.

For more information on companies in this article

Related Content

  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Road revamp project planned for Rwanda
    January 5, 2015
    Rwanda looks set to commence work on a major road revamp project. The project is for the construction of the 51km Base-Gicumbi-Rukomo road. Financing for the project is coming in the shape of a loan worth some US$74.7 million from the African Development Bank (AfDB). The Rwandan Government will also provide another $4.6 million for the road project later. The project is part of Base-Nyagatare road project that will connect the Northern and the Eastern provinces, with work likely to start in April 2015. The
  • Vietnam's new highway projects
    February 24, 2012
    Key highway projects are being planned in Vietnam. The Ninh Binh-Thanh Hoa expressway will run 127km and is expected to cost US$1.6 billion to construct. The Nghi Son-Bai Vot expressway will cost $1 billion to build and Vietnam's Ministry of Transport (MoT) hopes to source a loan from the World Bank for this project. Vietnam's MoT is putting the projects through the tender process at present. The deals will be made under either the build-operate-transfer (BOT) or public-private partnership (PPP) models. So
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan