Skip to main content

Nicaragua is planning major road investments

The Nicaraguan Government is setting out major plans for road infrastructure development. The country's master plan for road infrastructure envisages work to a total of 4,200km of main roads across the country. This programme is expected to cost in the order of US$5.20 billion, according to pre-feasibility studies carried out by Korea Expressway Corporation (KEC). Funding is being sought at present by the Nicaraguan Government, which is in discussion with a number of bodies.
March 30, 2015 Read time: 2 mins
The Nicaraguan Government is setting out major plans for road infrastructure development. The country's master plan for road infrastructure envisages work to a total of 4,200km of main roads across the country. This programme is expected to cost in the order of US$5.20 billion, according to pre-feasibility studies carried out by Korea Expressway Corporation (KEC). Funding is being sought at present by the Nicaraguan Government, which is in discussion with a number of bodies.

There are 76 motorway sections that will require 1,100kms of new road or widened roads. Along some other sections improvement works will only be needed. The plan is for 20 years with a first phase due to be finalised in 2023 and a second phase in 2033. It will cover six large sections, including three from north to south. Along this sector is the Penas Blancas-El Guasaule road that needs widening to four lanes along some parts and to six lanes along some others, such as the road between Managua and Granada. Work needs to be done along the motorway between Bluefields and Puerto Cabezas. The IADB and the government are working on financing for the Rosita-Bonanza and Pantasma-Wiwili sections. Around $2 billion should be secured by 2023. So far $600 million has been secured and the funding for a further $400 million is under discussion.

Related Content

  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • EU to provide funding for Greek highway studies
    May 10, 2012
    The Greek highway sector looks set to receive muchneeded external funding from the EU for key project studies. Co-funding will be provided by the EU for studies into major infrastructure projects. A study investigating a section of the Ionian Highway between the multi-level junction of Egnatia and the town of Kakavia in Greece will receive almost €2 million in EU contribution. This will be provided under the 2010 TEN-T Annual Call. The co-funded study will set the stage for the construction of a four-lane h
  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • 90% of Ukraine roads require major repairs, according to state agency advisor
    February 21, 2013
    A reported 90% of Ukraine's 169,000kms of roads require major repairs at a minimum cost of US$55.49 billion (UAH 450bn), according to the advisor of the head of Ukravtodor state agency Engeniy Prusenko. The budget of the state program for motor road development in 2013-2018, approved by the Ukrainian cabinet of ministers in September 2012, amounts to UAH 264bn. Prusenko says that the program's funding is carried out according to plan, but it is not enough to conduct the needed amount of repairs. The governm