Skip to main content

New viaduct proposed for Ecuador

A new road connection is being put forward for Ecuador, with the project expected to cost in the region of US$1.14 billion. The 44km connection would include a viaduct section over the Guayas River and connect the southern part of Guayaquil with Duran. The contract would require the road and viaduct to be constructed within a four year timeframe and would allow for a 40 year period to maintain the route.
October 9, 2018 Read time: 1 min
A new road connection is being put forward for Ecuador, with the project expected to cost in the region of US$1.14 billion. The 44km connection would include a viaduct section over the Guayas River and connect the southern part of Guayaquil with Duran. The contract would require the road and viaduct to be constructed within a four year timeframe and would allow for a 40 year period to maintain the route.

Related Content

  • Record-setting sea crossing proposed
    May 28, 2012
    The authorities in Oman are working on plans for a 40km bridge link. This bridge would connect to Masirah Island and would cross over the sea. The authorities hope to open the tender process some time during 2011. The project is expected to cost in the region of US$1.5 billion and faces many technical challenges.
  • Bolivia's Santa Cruz road corridor connector project
    December 22, 2016
    Bolivia’s ambitious Santa Cruz road corridor connector project is providing an important link for the country - Gordon Feller writes The World Bank has been organising a US$230 million loan to upgrade a vital connector linking the country’s northern and southern transit corridors. Meanwhile, another $100 million is coming from Bolivia’s government.
  • Vietnam: work on Phuoc Khanh cable stayed bridge to begin in August
    June 22, 2015
    Work on Vietnam’s 3.1km Phuoc Khanh cable stayed bridge will start in August after a deal was signed with the government in June. The contract was signed by the Vietnam Expressway Corporation and a consortium made up of Japanese contractor Sumitomo Mitsui and local partner Civil Engineering Construction Corporation (Cienco 4). The bridge is part of the 57km Ben Luc-Long Thanh Expressway project running through Long An Province, Ho Chi Minh City and Dong Nai province in southern Vietnam. The highway will a
  • Lower Thames Crossing contractor shortlist
    September 27, 2021
    The contractor shortlist has been announced for part of the Lower Thames Crossing.