Skip to main content

New South Poland dual carriageway

A new dual carriageway will connect the towns of Legnica and Lubawka in southern Poland. Funding for the project is being supplied by the EU in the shape of a subsidy worth €440.85 million. The S3 dual carriageway project is important for southern Poland as Lubawka lies close to the border with the Czech Republic. Building this new dual carriageway will provide a new link between the two countries. In all the dual carriageway construction work is expected to cost €919 million, with the work due for completi
October 15, 2018 Read time: 1 min

A new dual carriageway will connect the towns of Legnica and Lubawka in southern Poland. Funding for the project is being supplied by the EU in the shape of a subsidy worth €440.85 million. The S3 dual carriageway project is important for southern Poland as Lubawka lies close to the border with the Czech Republic. Building this new dual carriageway will provide a new link between the two countries. In all the dual carriageway construction work is expected to cost €919 million, with the work due for completion at the end of the second quarter of 2023.

Related Content

  • Support for Poland’s A1
    July 6, 2012
    The European Investment Bank (EIB) has in total granted a long-term facility of €1.070 billion for the construction of the second phase of the A1 motorway forming part of the priority trans-European transport network connecting the north of Poland (Gdansk) with the Austrian capital Vienna, via the Czech and Slovak Republics. The loan will finance the construction of a 62km section of the A1 motorway between Nowe Marzy and Torun on the basis of a design, build, finance and operate (DBFO) concession. This con
  • Czech tenders for D6 section near Karlovy Vary
    June 7, 2023
    The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
  • Colombia dual carriageway concession awarded
    January 29, 2021
    A key Colombian dual carriageway concession has been awarded.
  • Many bidders for key Polish dual carriageway works
    October 15, 2013
    Great interest has been shown in tenders advertised by GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.