Skip to main content

New South Poland dual carriageway

A new dual carriageway will connect the towns of Legnica and Lubawka in southern Poland. Funding for the project is being supplied by the EU in the shape of a subsidy worth €440.85 million. The S3 dual carriageway project is important for southern Poland as Lubawka lies close to the border with the Czech Republic. Building this new dual carriageway will provide a new link between the two countries. In all the dual carriageway construction work is expected to cost €919 million, with the work due for completi
October 15, 2018 Read time: 1 min

A new dual carriageway will connect the towns of Legnica and Lubawka in southern Poland. Funding for the project is being supplied by the EU in the shape of a subsidy worth €440.85 million. The S3 dual carriageway project is important for southern Poland as Lubawka lies close to the border with the Czech Republic. Building this new dual carriageway will provide a new link between the two countries. In all the dual carriageway construction work is expected to cost €919 million, with the work due for completion at the end of the second quarter of 2023.

Related Content

  • Polish project planned
    July 29, 2020
    A key Polish dual carriageway project is being planned.
  • New highway works planned for India
    February 10, 2025
    Major new highway works are planned for India.
  • South German road tunnel project to restart
    July 26, 2018
    Construction work on the Kramertunnel in South Germany is to restart. The tunnel is needed to help reduce traffic delays in the town of Garmisch-Partenkirchen in the southern German state of Bavaria and with lies next to the border with Austria. The twin tube tunnel stretches will both be around 2.8km long and the project will also include building six bridges as part of the new bypass around the town. The new bypass, with its tunnel and bridges, is required as traffic jams occur regularly in the town on th
  • Hungarian dual carriageway project underway
    June 12, 2019
    Work is underway on the M76 dual carriageway project in Hungary, with the first section due for completion in summer 2020. Building the 40km dual carriageway is costing over €523 million. The project includes building a bridge at Balatonszentgyorgy, which is due for completion shortly. When it opens to traffic, the M76 will connect the M7 motorway (the E71 route) with the M74 route at Zalaegerszeg.