Skip to main content

New bridge crossing for Louisiana

A new bridge carrying Interstate 10 is being planned for Calcasieu in Louisiana. The new structure is expected to cost from US$400-600 million to construct and will feature three lanes in either direction, with provision also for cyclists and pedestrians. The bridge will be built to the north of the existing I-10 bridge, which was constructed in 1952 and is no longer able to cope adequately with the traffic volumes it carries. The new bridge is expected to be funded privately, with tolls for drivers crossin
February 8, 2019 Read time: 1 min

A new bridge carrying Interstate 10 is being planned for Calcasieu in Louisiana. The new structure is expected to cost from US$400-600 million to construct and will feature three lanes in either direction, with provision also for cyclists and pedestrians. The bridge will be built to the north of the existing I-10 bridge, which was constructed in 1952 and is no longer able to cope adequately with the traffic volumes it carries. The new bridge is expected to be funded privately, with tolls for drivers crossing the structure. However approval for the project has yet to be given by the local authorities.

Related Content

  • US$834 million for Seattle area highway widening
    June 17, 2024
    A US$834 million highway widening project is underway for the Seattle area.
  • LA1 bridge project faces construction delay
    February 9, 2023
    The Department of Transportation and Development in the US state of Louisiana said delay to the US$57.7 million project could be as much as 10 months.
  • Paraguay-Brazil bridge facing delay
    November 15, 2017
    Brazil’s economic woes are now affecting the construction of a new bridge connecting the country with Paraguay. The project is expected to cost US$71.34 million and the contract was awarded to Construbase-Ciudad-Paulitec and the necessary environmental permits were also given earlier in 2017. However now that Brazil is unable to provide its portion of the funds necessary, the completion date will have to wait. The bridge was to have been the second such link between the two countries and is required as the
  • New York’s new bridge opens
    September 10, 2018
    The second span of the New York’s new cable-stayed bridge has now been completed and has opened to traffic. The final span of the Governor Mario M Cuomo Bridge, which replaced the Tappan Zee Bridge, has now been opened to drivers. The opening was delayed slightly due to concerns over the state of a section of the old bridge, now being demolished. The new link was constructed by a joint venture headed by Fluor. With the new bridge opening, all four lanes of eastbound traffic shifted to the new second span. T