Skip to main content

Myanmar bridge construction project underway

Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help
February 18, 2019 Read time: 1 min
Construction work is underway on the new bridge spanning the Bago River in Myanmar. Much of the funding for the 1,928m bridge is being provided by the 2416 Japan International Cooperation Agency (JICA) in the form of a loan worth US$272.6 million. It is expected to cost $289 million in all to build, with completion expected in 2023. The bridge connects Thanlyin with Yangon’s Thaketa Township area and is being built just 125m from the existing bridge over the Bago River. This new cable-stayed structure will help improve traffic flow as it features two lanes in either direction, reducing delays for drivers as the existing bridge can be congested at peak periods. Of importance is that it is being designed to carry the heavy trucks moving to and from the industrial areas around Yangon.

For more information on companies in this article

Related Content

  • Myanmar’s elevated expressway project
    October 11, 2018
    Momentum is gathering for the construction of a new elevated expressway in the city of Yangon in Myanmar. The project is expected to cost US$400 million ad the expressway will measure 27km-long. The new route will provide an improved road connection for Yangon International Airport to the city’s industrial area, Yangon Jetty and the Thilawa Special Economic Zone. It will also link with the Yangon-Mandalay highway and construction is expected to commence in 2019.
  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.
  • Myanmar elevated expressway project progress
    December 13, 2018
    Interest is strong in the project to build the Yangon Elevated Expressway Project in Myanmar. In all 12 firms applied during the tender process, with 10 companies having subsequently been shortlisted by Myanmar’s Construction Ministry. The project aims to reduce Yangon’s chronic traffic congestion issues. The shortlisted firms include companies from China, France, Japan, South Korea and Thailand, with some working together in consortia. The project is being managed jointly by the Construction Ministry and t
  • Bosphorus crossing updates
    November 29, 2013
    A group of seven banks is to fund the construction of the third Bosphorus Bridge crossing in Turkish commercial centre Istanbul. A group of six Turkish banks, Garanti Bankasi, Halk Bankasi, Is Bankasi, Vakiflar Bankasi, Ziraat Bankasi, and Yapi Kredi Bankasi, is being joined by the Netherlands-based Garantibank International to provide the necessary US$2.3 billion of funding required for the project. A joint Italian-Turkish consortium comprising Astaldi and IC Ictas will build the bridge, which will reduce