Skip to main content

Mostostal Warszawa makes lowest bids in Poland’s S9 tenders

A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.
November 24, 2017 Read time: 2 mins
A 3304 Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland.


The consortium’s bid was just over €187 million in total. Other bids which were received from a 945 Strabag consortium and a 3302 Budimex consortium.

Poland’s roads authority 1361 GDDKiA is expected to sign a deal in the second quarter of 2018 with work to start after mid-2019 and completion in 2021.
 
Meanwhile, contractor 3544 Warbud has signed deal with the GDDLiA to build a 2.5km section of Warsaw ring-road for nearly €94 million. The section will be of three 3.5m-wide lanes and a hard shoulder in each direction. Delivery is expected by mid-April 2021.

In north-western Poland, an agreement has been signed for more than €117 million of European Union support for construction of a section of the S6 dual carriageway. Work includes building around 54km of road as well as a number of service stations and six junctions.

The north-western contract is divided into three sections: Goleniow-Nowogard, Nowogard-Ploty and Ploty-Kielpino. The first of the sections is scheduled for completion in April 2019 and the third in May 2019.

For more information on companies in this article

Related Content

  • Polish road project – bids submitted
    September 29, 2020
    Bids have now been submitted for a key Polish road project.
  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes
  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan