Skip to main content

Metrostav and Budimex among bidders for Poland’s S7 section

Poland’s highways directorate, GDDKiA, says 12 bids have been received for construction of the second section of the S7 dual carriageway. The 15km section will run from the Lesznowola junction to the Tarczyn Polnoc junction. Metrostav submitted the highest offer at €118 million, while the cheapest offer came from a consortium of Porr Polska Infrastructure and Porr Bau. Other bidders include others, Budimex, Intercor and Polaqua.
April 25, 2017 Read time: 1 min
Poland’s highways directorate, 1361 GDDKiA, says 12 bids have been received for construction of the second section of the S7 dual carriageway. The 15km section will run from the Lesznowola junction to the Tarczyn Polnoc junction.


Metrostav submitted the highest offer at €118 million, while the cheapest offer came from a consortium of 3976 Porr Polska Infrastructure and Porr Bau. Other bidders include others, 3302 Budimex, Intercor and 8002 Polaqua.

Meanwhile, the city of Katowice is going to invest upwards of €133 million to rebuild two main intersections. A further €107 million from the European Union’s Environment Operational Programme will go towards the projects.

The Wezel Giszowiecki intersection will be finished by 2020 and expansion of the DK 81 road section including construction of a two-level collision-free junction should be open sometime in 2019.

For more information on companies in this article

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
  • Polish island tunnel connection planned
    February 7, 2017
    The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans