Skip to main content

Major German road contract awarded

A major road contract has been awarded close to Hesse in Germany.
By MJ Woof September 2, 2020 Read time: 2 mins
STRABAG is one of the partners in a major project in Hesse, Germany – image © courtesy of STRABAG

The contract for a major road project in Germany has been awarded for the A49 highway. The work will be carried out under the PPP model and is located close to Hesse.

The project is a design-build-finance-operate-maintain contract for A49 highway between Fritzlar and Ohmtal interchange. This 62km deal will be handled jointly by STRABAG Großprojekte and LEONHARD WEISS to close the gap between Schwalmstadt and the Ohmtal interchange

The project has a value of over € 700 million. The deal is for the construction of a 31km long section of the A49 highway between Schwalmstadt and the Ohmtal interchange in northern and central Hesse. The PPP project also includes the design and proportionate financing as well as the maintenance and operation of the motorway over a distance of nearly 62km between the Fritzlar junction and the Ohmtal A5/A49 interchange.

The client is the Federal Republic of Germany, represented by the State of Hesse, represented by Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The consortium A 49 Autobahngesellschaft has been established for the project and is held 50:50 between STRABAG Infrastrukturprojekt and Meridiam Investments SAS. The PPP contract is for a 30-year concession.

Financing has been provided by the KfW IPEX-Bank (Germany), the European Investment Bank (EIB), MEAG (Germany) and ČSOB (Czech Republic, part of the Belgian KBC Group). In all the project will cost around €1.3 billion.

“We are pleased about the renewed trust in our ability to successfully realise large infrastructure projects in public-private partnerships, something we are already demonstrating in Germany with the A8 and A5 motorways,” said Thomas Birtel, CEO of STRABAG.

The A49 between Fritzlar and the Ohmtal interchange is divided into four sections. The first section to the Neuental junction is already open to traffic. The second section to the Schwalmstadt junction is currently under construction by HessenMobil. Realisation of the new sections three and four, from Schwalmstadt over the Stadtallendorf-Nord junction to the Ohmtal interchange, should begin in September 2020. The contract includes upgrading the A5 along a 1.5km section at the Ohmtal intersection. The main construction works are scheduled for completion in the third quarter of 2024.

For more information on companies in this article

Related Content

  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • Brazilian road spend dips slightly for 2015
    July 9, 2015
    Brazil will spend at least US$1.63 billion in privately operated federal road infrastructure projects in 2015. This is down slightly, from $1.82 billion spent in 2014, according to estimates by the land transport agency NTT. Work this year includes a stretch of the BR-050 motorway operated by MGO, which already has seen around $104 million. Road operator Concer, which administers sections of the BR-060, BR-153 and BR-262, invested nearly $88 million between 2014 and the first quarter of 2015. Arter
  • Salini Impregilo expands in the US with purchase of Lane Industries
    November 12, 2015
    Italian global infrastructure group Salini Impregilo has agreed to buy 100% of Lane Industries, an American highways contractor and the “top private asphalt producer” in the US. Lane, a family-owned business based in Cheshire, Connecticut, was bought for US$406 million and has a turnover of around $1.5 billion. The company has three divisions: asphalt production, road projects and other infrastructure projects, in domestic and international markets. A statement from Salini said Lane is participating i
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the