Skip to main content

Major German road contract awarded

A major road contract has been awarded close to Hesse in Germany.
By MJ Woof September 2, 2020 Read time: 2 mins
STRABAG is one of the partners in a major project in Hesse, Germany – image © courtesy of STRABAG

The contract for a major road project in Germany has been awarded for the A49 highway. The work will be carried out under the PPP model and is located close to Hesse.

The project is a design-build-finance-operate-maintain contract for A49 highway between Fritzlar and Ohmtal interchange. This 62km deal will be handled jointly by STRABAG Großprojekte and LEONHARD WEISS to close the gap between Schwalmstadt and the Ohmtal interchange

The project has a value of over € 700 million. The deal is for the construction of a 31km long section of the A49 highway between Schwalmstadt and the Ohmtal interchange in northern and central Hesse. The PPP project also includes the design and proportionate financing as well as the maintenance and operation of the motorway over a distance of nearly 62km between the Fritzlar junction and the Ohmtal A5/A49 interchange.

The client is the Federal Republic of Germany, represented by the State of Hesse, represented by Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The consortium A 49 Autobahngesellschaft has been established for the project and is held 50:50 between STRABAG Infrastrukturprojekt and Meridiam Investments SAS. The PPP contract is for a 30-year concession.

Financing has been provided by the KfW IPEX-Bank (Germany), the European Investment Bank (EIB), MEAG (Germany) and ČSOB (Czech Republic, part of the Belgian KBC Group). In all the project will cost around €1.3 billion.

“We are pleased about the renewed trust in our ability to successfully realise large infrastructure projects in public-private partnerships, something we are already demonstrating in Germany with the A8 and A5 motorways,” said Thomas Birtel, CEO of STRABAG.

The A49 between Fritzlar and the Ohmtal interchange is divided into four sections. The first section to the Neuental junction is already open to traffic. The second section to the Schwalmstadt junction is currently under construction by HessenMobil. Realisation of the new sections three and four, from Schwalmstadt over the Stadtallendorf-Nord junction to the Ohmtal interchange, should begin in September 2020. The contract includes upgrading the A5 along a 1.5km section at the Ohmtal intersection. The main construction works are scheduled for completion in the third quarter of 2024.

For more information on companies in this article

Related Content

  • Bids for Višňové Tunnel's IT being evaluated
    March 31, 2023
    The contract, in Slovakia, also includes IT equipment for the D1 motorway stretch Lietavska Lucka - Visnove - Dubna Skala of which the tunnel is a part.
  • First part of Hradec-Smirice D11 gets planning permission
    June 12, 2017
    The Czech Transport Ministry has issued a planning permission for the first part of the planned D11 motorway construction for the 15.5km long section Hradec Kralove-Smirice which is expected to cost nearly €247 million.
  • VIDEO: Telstra drone LIDAR maps Melbourne’s EastLink Mullum Tunnel
    April 13, 2018
    One of the applications for LIDAR is to make high resolution 3-D maps. Self-driving cars are pre-loaded with a LIDAR map of the trials area in which they are permitted to fully self-drive themselves. The cars also have their own LIDAR scanner which captures a real-time LIDAR view of the vehicle’s surroundings. The fully autonomous driving system within these prototype cars compares the real-time LIDAR view against the pre-loaded LIDAR map to significantly increase the accuracy of their self-positioning
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci