Skip to main content

Major German road contract awarded

A major road contract has been awarded close to Hesse in Germany.
By MJ Woof September 2, 2020 Read time: 2 mins
STRABAG is one of the partners in a major project in Hesse, Germany – image © courtesy of STRABAG

The contract for a major road project in Germany has been awarded for the A49 highway. The work will be carried out under the PPP model and is located close to Hesse.

The project is a design-build-finance-operate-maintain contract for A49 highway between Fritzlar and Ohmtal interchange. This 62km deal will be handled jointly by STRABAG Großprojekte and LEONHARD WEISS to close the gap between Schwalmstadt and the Ohmtal interchange

The project has a value of over € 700 million. The deal is for the construction of a 31km long section of the A49 highway between Schwalmstadt and the Ohmtal interchange in northern and central Hesse. The PPP project also includes the design and proportionate financing as well as the maintenance and operation of the motorway over a distance of nearly 62km between the Fritzlar junction and the Ohmtal A5/A49 interchange.

The client is the Federal Republic of Germany, represented by the State of Hesse, represented by Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The consortium A 49 Autobahngesellschaft has been established for the project and is held 50:50 between STRABAG Infrastrukturprojekt and Meridiam Investments SAS. The PPP contract is for a 30-year concession.

Financing has been provided by the KfW IPEX-Bank (Germany), the European Investment Bank (EIB), MEAG (Germany) and ČSOB (Czech Republic, part of the Belgian KBC Group). In all the project will cost around €1.3 billion.

“We are pleased about the renewed trust in our ability to successfully realise large infrastructure projects in public-private partnerships, something we are already demonstrating in Germany with the A8 and A5 motorways,” said Thomas Birtel, CEO of STRABAG.

The A49 between Fritzlar and the Ohmtal interchange is divided into four sections. The first section to the Neuental junction is already open to traffic. The second section to the Schwalmstadt junction is currently under construction by HessenMobil. Realisation of the new sections three and four, from Schwalmstadt over the Stadtallendorf-Nord junction to the Ohmtal interchange, should begin in September 2020. The contract includes upgrading the A5 along a 1.5km section at the Ohmtal intersection. The main construction works are scheduled for completion in the third quarter of 2024.

For more information on companies in this article

Related Content

  • Kosovo road strategy
    March 5, 2012
    Plans are in hand to build a 55km highway in Kosovo to link capital Pristina with Skopje, the capital of neighbouring Macedonia.
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • India highway link opens to traffic
    March 6, 2018
    A new stretch of highway is now opening to traffic in India. The 80km stretch of highway runs between Kundli and through Manesar to Palwal. Called the KMP Expressway, the route has had something of a checkered history and has been completed somewhat later than originally intended. The concession was originally awarded in 2006 and the road should have been completed in 2009, according to the planned timeline.
  • New Argentina highway construction work
    January 11, 2019
    Construction is underway for Argentina’s new Mendoza-San Juan Highway – Mauro Nogarin reports The rehabilitation and maintenance works of more than 3,300km of routes is now underway in Argentina. This followed on after the takeover of six new road corridors under the Public-Private Partnership (PPP) model, which took place in August 2018. The rehabilitation and maintenance works are being carried out prior to the start of the main projects, which will include the construction of highways. Building these