Skip to main content

Legal challenge to Austria-Slovenia tunnel contract award

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.
August 23, 2018 Read time: 1 min

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.

Related Content

  • Germany’s A281 extension to include another Weser River tunnel
    January 21, 2019
    Work has started on a 5km extension, including a 1.1kkm tunnel under the Weser River, to Germany’s A281 motorway. The project around the northwestern city of Bremen will connect the A281 with the A27 by 2024 and cost around €345 million. Bremen will contribute €1 million.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • UAE mountain road construction complete
    January 5, 2017
    An eight year project to construct the highest road in the UAE is now complete, with key help having been provided by a fleet of Volvo CE machines The work was carried out by local contractor General Mechanic Company (GMC), with assistance from Volvo CE dealer FAMCO as well as Volvo CE itself and Volvo Trucks. The 36km road climbs 1,910m to its highest point in a mountain range and required the transportation of 5.5 million m3 of materials during its construction.
  • EC approves Croatia’s Istarski Ipsilon – Istsrian Y - expansion
    June 22, 2018
    The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network. The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula. The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.