Skip to main content

Key SR-91 highway upgrade underway in California

In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation
December 16, 2013 Read time: 2 mins
In the 972 US State of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation Commission (RCTC) has hosted a groundbreaking ceremony for the project. 3220 Parsons is acting as project and construction manager for this US$1.3 billion upgrade and is providing services including supporting RCTC in negotiating various co-operating agency and other third-party agreements. Parsons is also working on procurement of the design-build, toll systems integration, and toll facility operator contracts and acquisition of the project right-of-way. In addition, Parsons has already assisted RCTC with developing the project’s capital and operating expenses and project schedule leading to the setting up of the financial Agency Public-Private Partnership model. This deal included a $421 million Transportation Infrastructure Finance and Innovation Act (TIFIA) loan, $177 million in toll revenue bonds, and more than $670 million in RCTC-contributed equity. The SR-91 Project will add regular lanes, tolled express lanes, and auxiliary lanes as well as improve interchanges, bridges, ramps, and local streets. Construction will begin in early 2014, and the new lanes are expected to open in 2017. Nearly 280,000 vehicles travel SR-91 daily, and this number is expected to grow by another 140,000 vehicles by 2035. Once completed, the SR-91 Corridor Improvement Project will help improve transportation and reduce traffic delays.

For more information on companies in this article

Related Content

  • S&P Global Rating: credit stability for toll road operators
    August 14, 2017
    The outlook is generally stable for business conditions and credit quality for toll roads worldwide, according to the latest survey from ratings agency S&P Global.The exception is the US where the overall outlook is “positive”, noted the report S&P Global Ratings' 2017. The 21-page report considers broad economic and industry-specific trends. It looks at economic conditions, demographic trends and geopolitical risks that affect the movement of people and goods. “We expect stable or improving, but still frag
  • Balfour wins US-70 upgrade in North Carolina
    February 14, 2023
    Balfour is already involved in the US-70 Havelock Bypass and US-70 James City projects.
  • Canada: LINK 427 wins Ontario’s Highway 427 Expansion contract
    March 16, 2017
    LINK 427 has been selected for the US$457 million design, build, finance and maintain contract for the Highway 427 Expansion project in Ontario province. The LINK team consists of ACS Infrastructure Canada, Dragados Canada, Bot Infrastructure, Brennan Infrastructures, MMM Group and Thurber Engineering. The project, in the Toronto area, includes a new 6.6km extension of Highway 427 from Highway 7 to Major Mackenzie Drive and widening of 4km from Finch Avenue to Highway 7. Work includes building thre
  • Parsons wins award for Caldecott Tunnel
    November 8, 2013
    Parsons has won an award for its work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway proje