Skip to main content

Jasa Marga picks up a loan for the Medan-Kualanamu project

In Indonesia, state-controlled toll road operator Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project. The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI. The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May. Jasa Marga operates and manages 13 toll road concessions directly and nin
April 27, 2015 Read time: 2 mins
In Indonesia, state-controlled toll road operator 1083 Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project.

The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI.

The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May.

Jasa Marga operates and manages 13 toll road concessions directly and nine toll roads through its subsidiaries. Around three-quarters of Indonesia’s toll roads in Indonesia are operated by Jasa Marga.

In March, Jasa Marga said it is keen to source funding to finance 10 new highway projects totalling more than 270km. Jasa Marga hopes to source loans worth a total of $215.46 million for the work. However, the projects are expected to cost around $306.37 million to construct.

For more information on companies in this article

Related Content

  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat
  • Indonesia’s road revamp is seeing new road transport connections
    July 16, 2018
    Indonesia’s road development programme is continuing, with a series of major projects being carried out across the country that will boost transport connections. State funding will help progress on the Trans-Sumatra toll road, paying for six sections of the road link. In all the 1,480km toll road project is expected to cost nearly US$11.85 billion, with state funding paying for a significant portion of the work So far the state-owned construction firm, Hutama Karya, which is building much of the route has
  • Indonesian toll road firm to expand network
    December 14, 2015
    State-owned Indonesian toll road firm Jasa Marga plans to increase its network by 460km by 2018. This will bring its total network to 1,050km by 2018. During 2016, Jasa Marga intends to spend US1 billion developing its toll road network and general operations. By 2018, the Trans Java toll road should be open to traffic.