Skip to main content

Hochtief buys out Bilfinger to take control of Herren Tunnel Lubeck

Global infrastructure group Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger. The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments. A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel
March 14, 2016 Read time: 2 mins
Picture courtesy of Hochtief
Global infrastructure group 981 Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger.

The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments.

A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel Lubeck planned, financed and built the project and is operating the tunnel until 2035 when it will be handed over to the Hanseatic City of Lubeck

The 1km tunnel in Lubeck, northern Germany, cost around €78.5 million and is one of Germany’s first toll roads. It is part of the 2.1km toll road that runs under the Trave River. The tunnel replaced a bascule bridge over the Trave River which was not fully functional at the time.

A statement by Hoctief in 2005 said that the total investment was €176 million, of which the German federal government contributed €90 million - the same for construction and maintenance of a new bridge.

For more information on companies in this article

Related Content

  • Montreal’s new Champlain Bridge is in a race against time
    June 8, 2018
    Montreal’s US$3.24 billion Champlain Bridge across the St Lawrence River may not be open on time, according to a report by the independent Auditor General. The 3.4km cable-stayed bridge has two decks supporting three lanes of highway traffic in each direction. A third, central deck supports a mass transit system and a multi-use path. The new bridge will replace the nearby 50-year-old Champlain Bridge which has been deteriorating at an alarming rate. The government signed a contract in 2015 with a private
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • Road pricing revenue a source of investment funds
    February 16, 2012
    When channelled back into the road sector, revenue from road charging is seen by many as a source of additional investment and research funds as Patrick Smith reports. Late in 2010, three major European organisations put out a policy statement calling for fair charging for greener, smarter and safer road infrastructure. ASECAP (the European toll road operators organisation); ERF (European Road Federation) and the IRU (International Road Transport Union), said that in recent years the concept of road chargin
  • Ireland's highway and tunnel projects
    May 10, 2012
    Northern Ireland construction company, Lagan Construction, is celebrating its part in two major infrastructure projects in Ireland. The company said that the openings of the A1 dual carriageway bypass at Newry, Northern Ireland, and the Limerick Tunnel, Republic of Ireland, were major achievements, and had employed 350 people over the past four years. The €138 million Newry bypass, commissioned by the Roads Service in December 2007 and completed five months ahead of schedule, was delivered by Amey Lagan