Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • Polish road tender process underway
    November 8, 2019
    The tender process is underway again for a 24km stretch of road in Poland. Motorways (GDDKiA). Offers have so far been received by Budimex, Unibep, Porr and Polaqua, with the lowest bein
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th