Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Polish road projects commencing shortly
    November 19, 2015
    Two major road projects are planned for Poland. Spanish construction firm Dragados intends to start work building a 25km ring road around the Polish city of Radom in the second half of 2016. The road will cost over €171.67 million to construct and will be completed in 2018. The work includes building four bridges, four junctions and two pedestrian bridges. The new ring road will form a part of the S7 road and reduce journey time between Krakow, Kielce and Warsaw.
  • Sweden and Denmark consider link between Helsingør and Helsingborg
    July 2, 2018
    Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail. The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg. Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.
  • Moldova gets EBRD loan for M1, M2 upgrades
    August 28, 2023
    The work will enhance transport connectivity by strengthening core transport links with a focus on the pan-European TEN-T network.