Skip to main content

Grupo Rubau awarded a section of Poland’s S-61 Expressway project

Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
February 5, 2018 Read time: 1 min
Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland.


Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.

The S-61, still under construction, runs from the Lithuanian border in the northeast, connecting Lituania’s A5 near Budzisko, to intersect express road S8 near Ostrów Mazowiecka. When finished it will be part of the Via Baltica – European Route E67.

The E67 runs from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. It goes via Prague, Wrocław, Warsaw, Kaunas, Panevėžys, Riga, Tallinn and Helsinki. However, only the 970km stretch between Warsaw and Tallinn is known as he Via Baltica.

Related Content

  • FCC Corredor de las Playas wins Panama Inter-American Highway deal
    November 21, 2017
    The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway. FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso. The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the
  • Poland: Budimex picks up S3 express road work near Lubin
    December 18, 2014
    The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
  • Deal struck for Poland's A2 highway
    February 27, 2012
    Work on two sections of Poland's A2 highway originally planned to be built by the Chinese COVEC will now be constructed by two consortia.
  • Serbia road project, funding secured
    February 19, 2019
    Construction of the 77km-long Merdare-Nis highway in Serbia is to benefit from external financing. A funding package worth €100 million is being supplied by the European Investment Bank (EIB) for the project. The funding will pay for work on a stretch of the route between Plocnik and Nis in southern Serbia. The highway will improve transport connections with neighbouring Kosovo when it is complete. This project forms part of a series of road building operations in the region, with extensive work having been