Skip to main content

Germany’s road repair funding shortfall

Germany has a massive backlog of works required on its high speed road network. A report by Germany’s institute for economic research (DIW) says that the backlog of work for the transportation network corresponds will cost in the region of €80 billion to €100 billion to complete. According to the DIW report, around 50% of Autobahn bridges and 20% of Autobahn routes are in a critical state. In addition, German railway company Deutsche Bahn (DB) estimates that there are around 1,400 railway bridges that need
September 30, 2015 Read time: 1 min
Germany has a massive backlog of works required on its high speed road network. A report by Germany’s institute for economic research (DIW) says that the backlog of work for the transportation network corresponds will cost in the region of €80 billion to €100 billion to complete. According to the DIW report, around 50% of Autobahn bridges and 20% of Autobahn routes are in a critical state. In addition, German railway company Deutsche Bahn (DB) estimates that there are around 1,400 railway bridges that need to be upgraded.

Related Content

  • Lidl by Lidl, more rental bikes in Berlin
    November 14, 2016
    German discount supermarket chain Lidl is to sponsor 3,500 new rental bicycles in Berlin. The bicycle system Lidl Bikes will be operated by DB Rent, a subsidiary of German railway provider Deutsche Bahn (DB), and be available from spring next year. DB Rent, which has been running rental bicycles for nearly 15 years, is operating around 10,000 bicycles in 50 German cities. The system of flexible borrowing will cover Berlin's S-Bahn commuter train region. But from the end of 2017 Lidl Bikes will face
  • Atlas Copco attachments make short work of the A8 Blaubeurer Weg Bridge
    March 21, 2016
    A reinforced concrete bridge over the Autobahn 8 between Merklingen and Nellingen in southern Germany was demolished overnight due in no small part to the efficient, reliable performance of Atlas Copco hydraulic attachments. In addition to demolition grippers, breakers and pulverisers, the demolition team used the HM 2000 hydraulic magnet to demolish structures and sort demolition waste. There is now nothing to stop the widening of the A8 to six lanes or construction of the parallel high-speed Wendlingen
  • Rader Hochbrücke construction set for summer
    April 7, 2025
    Work on the Rader Hochbrücke (bridge) near Rendsburg, Germany, will start this summer and take five years, according to DEGES.
  • Michigan's ageing bridges
    February 16, 2012
    The US state of Michigan needs to invest in highway bridge repairs.