Skip to main content

Galliford Try aims to downsize its construction business

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
April 25, 2019 Read time: 3 mins
Liebherr cranes at work on the Queensferry Crossing, Scotland

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing.

“The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement.

“The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of positions in legacy and some current contracts and the effect of some recent adverse settlements, as well as the costs of the restructure. The single largest element relates to the Queensferry Crossing joint venture, which has recently increased its estimated final costs on the project,” the statement noted.

Galliford Try was part the consortium including 917 ACS (Hotchief, 4761 Dragados) and 1021 American Bridge to build the road bridge over the River Forth that was originally set at £795 million (€920 million) in 2011. The 2.7km bridge was officially opened by the UK’s Queen Elizabeth in September 2017 (see 3260 World Highways, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external key project report false http://www.worldhighways.com/sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ false false%>, November 2015).

The three-tower cable stayed bridge was built alongside the existing Forth Road Bridge and carries the M90 motorway across the Firth of Forth between Edinburgh, at South Queensferry, and Fife, at North Queensferry. The final cost came in at £1.35 billion (€1.56 billion).

Galliford also said that it is assessing its work and costs on the completed Aberdeen Western Peripheral Route. “The board expects that the outcome of this assessment will reduce the group's full year post‐exceptional profit before tax by £30-40 million (€35-46 million) below the current consensus analysts' forecast.”

The contract for 4068 Transport Scotland’s Aberdeen Western Peripheral Route - unofficially called the Aberdeen bypass – was awarded in June 2014 to Connect Roads, a joint venture between 1146 Balfour Beatty Investments, 2435 Carillion Private Finance (Transport) and 3932 Galliford Try Investments. The final section of the bridge was opened in February.

The estimated cost in 2009 was up to £395 million (€457 million) but rose to around £745 million (€862 million) by 2016. The collapse of Carillion and some issues with concrete helped push the final price tag to over £1 billion (€1.15 billion), according to media reports.

Galliford’s announcement to cut back its construction division comes after the company appointed Graham Prothero as chief executive last month. Prothero, who joined the company as finance director in 2013, takes over from Peter Truscott who said he is leaving to pursue other opportunities. Prothero’s career includes finance director at Development Securities and as a partner at 5483 Ernst &amp; Young consultants. A corporate statement at the time of his appointment said he will “maintain Galliford Try’s progress towards the group’s 2021 strategy”.

For more information on companies in this article

Related Content

  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti
  • Harsco goes Forth
    June 25, 2012
    Harsco Infrastructure (HI) is providing bespoke scaffolding for a major refurbishment project being carried out on the famous Forth Road Bridge in Scotland. The £710,000 contract is seeing HI scaffolding used to allow work to be carried out to replace the large bearings which support each end of the structure, with no disruption to traffic using the bridge.
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • Wacker Neuson rebar tiers at Queensferry
    February 7, 2017
    When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor. Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK. Construction