Skip to main content

Galliford Try aims to downsize its construction business

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
April 25, 2019 Read time: 3 mins
Liebherr cranes at work on the Queensferry Crossing, Scotland

UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing.

“The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement.

“The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of positions in legacy and some current contracts and the effect of some recent adverse settlements, as well as the costs of the restructure. The single largest element relates to the Queensferry Crossing joint venture, which has recently increased its estimated final costs on the project,” the statement noted.

Galliford Try was part the consortium including 917 ACS (Hotchief, 4761 Dragados) and 1021 American Bridge to build the road bridge over the River Forth that was originally set at £795 million (€920 million) in 2011. The 2.7km bridge was officially opened by the UK’s Queen Elizabeth in September 2017 (see 3260 World Highways, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external key project report false http://www.worldhighways.com/sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ false false%>, November 2015).

The three-tower cable stayed bridge was built alongside the existing Forth Road Bridge and carries the M90 motorway across the Firth of Forth between Edinburgh, at South Queensferry, and Fife, at North Queensferry. The final cost came in at £1.35 billion (€1.56 billion).

Galliford also said that it is assessing its work and costs on the completed Aberdeen Western Peripheral Route. “The board expects that the outcome of this assessment will reduce the group's full year post‐exceptional profit before tax by £30-40 million (€35-46 million) below the current consensus analysts' forecast.”

The contract for 4068 Transport Scotland’s Aberdeen Western Peripheral Route - unofficially called the Aberdeen bypass – was awarded in June 2014 to Connect Roads, a joint venture between 1146 Balfour Beatty Investments, 2435 Carillion Private Finance (Transport) and 3932 Galliford Try Investments. The final section of the bridge was opened in February.

The estimated cost in 2009 was up to £395 million (€457 million) but rose to around £745 million (€862 million) by 2016. The collapse of Carillion and some issues with concrete helped push the final price tag to over £1 billion (€1.15 billion), according to media reports.

Galliford’s announcement to cut back its construction division comes after the company appointed Graham Prothero as chief executive last month. Prothero, who joined the company as finance director in 2013, takes over from Peter Truscott who said he is leaving to pursue other opportunities. Prothero’s career includes finance director at Development Securities and as a partner at 5483 Ernst &amp; Young consultants. A corporate statement at the time of his appointment said he will “maintain Galliford Try’s progress towards the group’s 2021 strategy”.

For more information on companies in this article

Related Content

  • New Forth Road Bridge
    June 25, 2012
    Halcrow has been appointed by Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and the existing Forth Road Bridge. The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014. “Halcrow’s proven expertise as a client advisor helped us to deliver a winning proposition that targeted our client’s needs,” said Donald Bell, Halcrow’s client manager. “Our ro
  • Halcrow goes Forth with big Transport Scotland contract
    May 8, 2012
    Halcrow has been appointed by Transport Scotland to develop a bridge operating company contract to manage and maintain the new Forth Replacement Crossing and existing Forth Road Bridge. The £1.6million commission, won in the face of stiff competition under Transport Scotland’s multiple framework agreement, runs to December 2014.
  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • Ireland and Scotland link?
    March 1, 2018
    Politicians in Northern Ireland have again raised the prospect of bridge to link western Scotland the Irish island, according to media reports. The road and rail crossing as envisaged by the Democratic Union Party would cost close to €23 billion. It would run between the Irish town of Larne in County Antrim and the Dumfries and Galloway coastline in Scotland. The DUP said in its manifesto for the 2015 UK general election that there should be a feasibility study into building a bridge or tunnel.