Skip to main content

Flatiron wins Winnipeg interchange project in Canada

US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
August 5, 2015 Read time: 2 mins
US-based contractor 2758 Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba.

The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101.

Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embankment and demolition of a bridge and some roadway upgrades.

Provincial Trunk Highways 101 and 100 are together known as Winnipeg’s Perimeter Highway, around 90km long. It is an alternate route for through traffic, as there are no freeways through the city.

In June, Flatiron started work on a 3.4km Champlain Bridge across the St Lawrence River in Montreal, in the province of Quebec. The bridge is downstream from the existing Champlain Bridge, built in the 1960s. The new bridge includes three corridors, with two three-lane corridors for vehicle traffic and a two-lane transit corridor with light rail transit capabilities for future use.

For more information on companies in this article

Related Content

  • US land sale completed for US-Canada Gordie Howe Bridge
    June 27, 2017
    Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Private owners seek a buyer for the UK’s only toll road, M6 Toll
    February 15, 2016
    Britain’s only toll road, the motorway M6 Toll, is up for sale by its owners, a consortium of banks that hope to recover some of the €2.45 billion of debt. The 27 owners of M6 Toll, including Crédit Agricole, Commerzbank and Banco Espirito Santo, took over the 43km pay-as-you-go toll road from infrastructure group Macquarie in December 2013 after a debt restructuring. Midland Expressway Limited (MEL), part of Macquarie Atlas Roads, continues to operate the six-lane motorway around the English city of
  • Private consortium to finance Melbourne's Peninsula Link highway
    July 13, 2012
    Not long after the recent completion of the successful EastLink project (a 39km motorway providing a vital connection for 1.5 million people in Melbourne, Australia) the Victorian Government has started work on another missing link in Melbourne's freeway network further south with the construction of Peninsula Link. Peninsula Link is a key project in the Victorian Government's AUD$38 billion (US$32 billion) Victorian Transport Plan. With a AUD$750 million (US$630 million) price tag, the project is expected