Skip to main content

Flatiron and Dragados win Corpus Christi Bridge deal

The Texas Transportation Commission has conditionally awarded the two companies, Flatiron and Dragados the contract to design, build and operate a new cable stayed Corpus Christi Harbor Bridge.
June 25, 2015 Read time: 2 mins
Old 1956 Corpus Christi Bridge to be replaced

The 3496 Texas Transportation Commission has conditionally awarded the two companies, 2758 Flatiron and 4761 Dragados the contract to design, build and operate a new cable stayed Corpus Christi Harbor Bridge.

The structure will be the longest cable stayed bridge in the United States and allow larger ships access to the city’s port, according to a statement by 917 ACS Group, the Spainsh parent company of Dragados. Flatiron is a wholly owned subsidiary of German company 981 Hochtief, in which ACS has a 50.16% stake.

Flatiron/Dragados, one of four bidders shortlisted by the Texas DoT last year, won the contract with a bid of US$983.4 million.

The other three bidding groups were Harbor Bridge Constructors, owned by Walsh Infrastructure; Harbor Bridge Partners, owned by Kiewit Development; and Traylor-Zachry-Fluor Crosstown Builders, made up of 2760 Traylor Brothers, Zachry Construction and 6343 Fluor Enterprises.

The current Harbor Bridge was opened in 1956 to replace a drawbridge and now handles 26,000 vehicles per day. In December 2011, an LED lighting system was installed as joint project between the City of Corpus Christi, the Port of Corpus Christi, the Texas Department of Transportation and American Bank, at a cost of around $2.2 million.

The contract includes an allocation amounting to $854.6 million for design and construction of the bridge and another $128.2 million for the maintenance and operation of the bridge for 25 years.

Flatiron/Dragados will demolish the existing Harbor Bridge and also make improvements to local highways. The new structure across the entrance channel of the Port of Corpus Christi will have six spans, with a 505m main span, “which will constitute the greatest length between supports for a cable-stayed bridge in the United States”. The bridge will also have a clearance of 62m to allow the largest ocean-going vessels, including those that cross the expanded Panama Canal, to access the Port of Corpus Christi.

The project also includes works on the US 181 motorway, on which the bridge is situated, and on the I-37 and SH-286 motorways.

ACS, as part of another consortium, recently announced it had won the contract for the new Champlain Bridge over the St. Lawrence River in Montreal, Canada - “an essential step for its consolidation in Canada”.

Last July, the Texas Department of Transportation awarded 3005 Atkins a six-year management consultancy contract worth $25 million. The deal covers right-of-way oversight, compliance review and utility coordination services for transportation-related public-private partnership projects. Atkins is advising on design-build contracts and other delivery methods.

 

For more information on companies in this article

Related Content

  • Ramboll appointed independent engineer on Champlain Bridge Project
    September 8, 2015
    Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium
    April 17, 2015
    The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31