Skip to main content

Ramboll appointed independent engineer on Champlain Bridge Project

Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
September 8, 2015 Read time: 2 mins
Proposed Champlain Bridge (artist impression)
6801 Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada.

Ramboll, based in Denmark, will work with the Canadian consultant 5346 Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America.

Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion.

“The new contract is in line with Ramboll’s strategy for North America where we are pursuing several other larger bridge and tunnel projects,” said Lars Thorbek, head of Ramboll’s department for international bridges.

World Highways reported in April that the Canadian government had awarded the multi-billion dollar contract for the Champlain Bridge, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal.

The consortium, called Signature on the Saint-Lawrence Group, includes Spanish firms 4761 Dragados Canada and ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project includes a new île des Soeurs Bridge along with reconstruction and widening of the federal portion of Autoroute 15. But the crown-jewel of the project is the New Champlain Bridge, a 3.4 km crossing of the main channel of the St. Lawrence River, which includes a cable stay section over the St. Lawrence Seaway.

Construction is set to begin in the summer of 2015. The New Champlain Bridge will be in service in 2018 and the rest of the corridor will be completed in 2019.

This past summer, Canada-based Canam-Bridge was chosen to fabricate the superstructure for the new bridge. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, said at the time he expects at least 45,000tonnes of steel will be required for the 3.4km bridge.

For more information on companies in this article

Related Content

  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium
    April 17, 2015
    The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other
  • Quebec to build new Mercier Bridge for Montreal city
    May 12, 2017
    The Canadian province of Quebec plans to build a US$219 million bridge across the St Lawrence River alongside the existing Mercier Bridge in the city of Montreal. Provincial government cabinet ministers Pierre Moreau and Geoff Kelley confirmed that a new bridge is forthcoming, but gave schedule for procurement or construction start, according to local media. However, Moreau said the work will begin probably before the new Champlain Bridge is finished at the start of 2019. Construction of the new Champlain B