Skip to main content

Fehmarnbelt hearings to start

The Danish-German project has come under financial and environmental criticism.
By David Arminas September 24, 2020 Read time: 2 mins
A four-lane motorway and double-track electric railway tunnel will run under the Baltic Sea strait

A German court will soon open proceedings in seven lawsuits against the planned rail and road link between the German island of Fehmarn and Denmark.

A four-lane motorway and double-track electric railway tunnel will run under the Fehmahrnbelt strait and the Danish government is shouldering the estimated €7.4 billion (US$8.54 billion) construction cost. The cases have been brought by environmental organisations, a farmer, communal authorities and two ferry operators whose services the project likely make redundant.

The ambitious project has run into repeated financial and environmental criticism since it was agreed several years ago by the two national governments to get the project underway. It will allow trains to cross the strait in just seven minutes and take cars ten minutes respectively. Currently, a ferry takes about an hour to make the crossing.

The Fehmarnbelt link will be built as an immersed tunnel. Hollow 73,000-tonne concrete elements, cast on land, will be barged out to sea and lowered into place along a 60m-wide, 16m-deep trench in the seabed.

In July, German and Danish media reported that around 30 supporters and activists of the Beltretter protest group held a gathering standing in the Baltic Sea at the Grüner Brink nature reserve near the Puttgarden ferry pier. They held a banner that read ‘Protect the Baltic Sea. Stop tunneling’ and voiced concern over possible damage to the environment and tourism in the Bay of Lübeck.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Femern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, SWECO is handling the design for the dredging and reclamation work.

 

For more information on companies in this article

Related Content

  • Doubts over a Helsingør-Helsingborg link
    April 14, 2021
    Danish minister questions feasibility of a road-rail tunnel between the Danish and Swedish cities.
  • Denmark eyes Little Belt Fixed Link
    November 8, 2023
    The directorate is concerned that the so-called New Little Bridge, which opened in 1970, will suffer severe traffic congestion from 2030 onwards.
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
  • Further delays expected for the Fehmarn Belt Fixed Link
    August 26, 2015
    Further delays to the planned Fehmarn Belt Fixed Link between Germany and Denmark appear likely because of objections to the project during the planning stages, Danish media reported. Government authorities in the German state of Schleswig-Holstein indicated that permission for the project, which focusses on a 17km immersed road and rail tunnel, will probably be given in 2017, and not next year as previously believed. German authorities have received about 3,100 objections to the project that has rise