Skip to main content

FCC Corredor de las Playas wins Panama Inter-American Highway deal

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway. FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso. The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the
November 21, 2017 Read time: 2 mins
Artist impression of the Inter-American Highway between La Chorrera and Santa Cruz in Panama’s province of Panama Oeste.

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway.

FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso.

The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the bypasses around the towns of Capira and Campana.

The widened section will improve the connection with the end of the Arraiján-La Chorrera motorway and the new Pan-American Highway. Traffic volume over the section will be around 30,000 an hour.

Other projects for FCC Construcción in Latin America include construction of sections 1 and 2 of the Vía Brasil corridor and rehabilitated and enlarged the Arraiján-La Chorrera section of the Pan-American Highway.

In Mexico, FCC built the 850m-long San Marcos Viaduct as part of Mexico’s Nuevo Necaxa motorway project. FCC’s work on the 36km Nuevo Necaxa-Ávila Camacho section including the viaduct was done in a joint venture with the Mexican company ICA

Related Content

  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Spedition UMB and Tehnostrade to build an orbital around Bacau
    August 14, 2018
    A joint venture of Spedition UMB and Tehnostrade has won the design-build contract for an orbital road around the Romanian city of Bacau. Romania’s National Company for the Administration of Road Infrastructure (CNAIR) awarded the contract that is expected to be worth almost €145 million. Planning is expected to last six months and construction to take 30 months for the nearly 31km road of which around 16km will be motorway. The road around Bacau, with a population of more than 200,000, will be integr
  • Brazilian project due
    February 9, 2012
    Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency Consema for the 44.5km extension of the highway.
  • IDB, iRAP extend Latin America-Caribbean work
    February 25, 2025
    The five-year deal was signed during the Ten Steps to 2030 for Safer Road Infrastructure Side Event at the recent 4th Global Ministerial Conference on Road Safety underway in Marrakech, Morrocco.