Skip to main content

FCC Corredor de las Playas wins Panama Inter-American Highway deal

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway. FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso. The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the
November 21, 2017 Read time: 2 mins
Artist impression of the Inter-American Highway between La Chorrera and Santa Cruz in Panama’s province of Panama Oeste.

The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway.

FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso.

The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the bypasses around the towns of Capira and Campana.

The widened section will improve the connection with the end of the Arraiján-La Chorrera motorway and the new Pan-American Highway. Traffic volume over the section will be around 30,000 an hour.

Other projects for FCC Construcción in Latin America include construction of sections 1 and 2 of the Vía Brasil corridor and rehabilitated and enlarged the Arraiján-La Chorrera section of the Pan-American Highway.

In Mexico, FCC built the 850m-long San Marcos Viaduct as part of Mexico’s Nuevo Necaxa motorway project. FCC’s work on the 36km Nuevo Necaxa-Ávila Camacho section including the viaduct was done in a joint venture with the Mexican company ICA

Related Content

  • Going mobile in Mexico
    April 12, 2012
    Mexico-based Grupo Pinfra was one of the country's first aggregate producers to invest in mobile crushing and screening equipment. Twenty years on, the company is still confident that mobile equipment is key to meeting demand and has just expanded its fleet. In 1991, Pinfra took delivery of two Metso Minerals Lokotrack LT125 mobile crushers and these have now clocked up 30,000 working hours. Nonetheless, there is still plenty of life in these machines and while the newly acquired LT140 jaw crusher takes
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Bolivia's Santa Cruz road corridor connector project
    December 22, 2016
    Bolivia’s ambitious Santa Cruz road corridor connector project is providing an important link for the country - Gordon Feller writes The World Bank has been organising a US$230 million loan to upgrade a vital connector linking the country’s northern and southern transit corridors. Meanwhile, another $100 million is coming from Bolivia’s government.
  • Colombia tunnel construction contract commencing
    February 5, 2018
    Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.