Skip to main content

EU launches investigation into Fehmarn Belt financing model

The European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules. The announcement follows the European Union General Court's annulment of a previous Commission decision approving the support. "Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.
June 21, 2019 Read time: 2 mins

The 2465 European Commission said it will investigate the public financing for the Fehmarn Belt link to see if it in line with state aid rules.

The announcement follows the 1116 European Union General Court's annulment of a previous Commission decision approving the support.

"Today's opening of such an investigation is an invitation for all stakeholders to provide their input, which will allow the Commission to adopt a new, well-informed final decision,” said Margrethe Vestager, EU Competition Commissioner.

This financing model is likely to see European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the 1035 Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

The fixed immersed tunnel 18km link across the Fehmarnbelt will carry a four-lane motorway alongside a twin track-electrified railway. It will be more than five times the length of the tunnel under Øresund linking Denmark and Sweden and more than three times the length of the record-holding Trans-Bay Tube Bart Tunnel in San Francisco in the 972 US state of California.

Vehicle passage through the tunnel at 110kph is expected to take around 10 minutes. Duration of the train journey between Hamburg in northern Germany and the Danish capital  Copenhagen will be cut from about four and a half hours to three, according to engineering consultant 6801 Ramboll which is collaborating with 8624 Tunnel Engineering Consultants (TEC) og 1419 Arup. 6801 Ramboll is advising Fehmarn on the design of the immersed tunnel solution.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • Tunnel technology improves driving safety
    February 14, 2012
    Tunnel technology advances will make driving through underground links considerably safer, writes Mike Woof
  • Brazil: contractors fear more layoffs as DNIT fails to pay up
    November 25, 2014
    The head of Brazil’s association of road constructors has warned of more layoffs unless the National Department of Infrastructure and Transport (DNIT) starts paying its contractors. Jose Alberto Pereira Ribeiro, president of ANEOR – National Association of Road Works - said companies already have been forced to lay off around 1,700 workers in light of non-payment by the government. Another 950 employees are on forced holidays. Ribeiro claimed DNIT failed to meet its financial obligations for September
  • London’s congestion charge is saving lives, a study suggests
    March 9, 2015
    Traffic accidents in the UK capital London have declined 40% since the introduction of a congestion charge in 2003, according to a new study. The number of accidents per million miles driven in the congestion zone fell to 2.6 accidents per million miles from an average of 12.4 before the introduction of the charge. Researchers at Lancaster University also found a similar fall in the number of people seriously injured or killed. As well, accident rates fell in adjacent areas as a result of fewer motorists dr
  • Re-branding of Waitzinger pumps is just the first step to integration with new parent Liebherr
    January 6, 2017
    Having acquired concrete pump manufacturer Waitzinger in October 2012, Liebherr is presenting the four-pump range in the yellow Liebherr livery. This is the first step towards integrating Waitzinger into the huge Liebherr empire. The next steps will see the integration of the two sales organisations. “There will be some markets where Liebherr is strong and some where Waitzinger is strong,” said spokesperson Kristian Kueppers. “We have to look at these and build up the sales organisation where it is required